Publications

Filter
Topic
Publication State
Showing 11 - 20 of 88 Publications
Heat Degradation of Hot Poured Joint Sealant
This test method describes the procedure for determining the degree to which a joint sealant is degraded by heat during prolonged storage (6 
Bituminous Pavement Crack Sealing
Austroads Technical Specification ATS 3470 sets out the requirements for: the supply of hot placed elastomeric / crumb rubber joint sealant
Webinar: Austroads Project Pipeline 2022-23
This webinar introduces Austroads new projects lined up for the 2022-23 financial year. The session is most beneficial to consultants who may be interested in tendering for Austroads projects. Upcoming projects focus on road network resilience,…
Preparing Pavements for Resealing – Planning of Works
This Pavement Work Tip provides guidelines for the planning of works in preparation for resealing.
Cape Seals
This Pavement Work Tip is a guide to the use of Cape Seals.
Geotextile Reinforced Seals
This Pavement Work Tip provides a guide to the use of geotextile reinforced sprayed seals.
Initial Treatments – Priming of Pavements
This Pavement Work Tip provides guidance on the selection and design of primes.
Sprayed Sealing – Uniformity and Neatness
This Work Tip details work practices that help ensure uniformity of Binder Application Rates and neatness of joints in sprayed seals.
Sprayed Sealing – Surface Enrichment
This Pavement Work Tip provides a guide to the light application of bituminous binder to an existing asphalt or spray seal surface to increase the binder level on the surface and prevent aggregate loss.
Sprayed Sealing – Joint Locations and Effect on Binder Application Rates
This Pavement Work Tip considers traffic distribution and its effect on the suitable location of joints and where the design Binder Application Rates should be varied to allow for the expected traffic volume.