Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Materials
Pavement
Project Delivery
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Guides
4
Test Methods
4
Topic
Topic
Active travel
10
Aggregates
10
Asphalt
14
Assessing Fitness to Drive
9
Automated vehicle policy
10
Automated vehicle safety
10
Bicycles
9
Binders
12
Binders test methods
12
Bitumen
9
Bituminous mixes test methods
Biutmen
9
Bridge construction
10
Bridge design
14
Bridge management
12
Bridge materials
9
Bridge performance
9
Bridgeworks specifications
15
Cemented materials
9
Community attitudes
9
Concrete
12
Contracts
10
Crash analysis
13
Data management
11
Design principles and process
19
Drainage
17
Driver licensing
9
Economic evaluation
21
Evaluation values
12
Geometric design
21
Granular materials
9
Incident management
9
Intersection design
23
Land use planning
9
Materials testing
9
Network management
13
Older drivers
9
Other assets management
11
Parking
10
Pavement construction
13
Pavement design
16
Pavement maintenance
10
Pavement management
21
Pavement performance
32
Pavements specifications
10
Pedestrians
9
Process and documentation
9
Procurement
10
Project governance
9
Project planning
Recycled material
14
Reporting
9
Risk assessment
10
Roadside design
14
Rural and remote
9
Safe people
10
Safe roads
21
Safe System
12
Safe system
12
Safe vehicles
9
Safety audit
11
Safety programs
13
Safety strategy
10
Seals
10
Smart motorways
9
Speed management
9
Stabilised materials
12
Strategic asset management
13
Structures management
11
Temporary traffic management
17
Traffic and safety
11
Traffic controls
18
Traffic management
26
Traffic operations
12
Traffic theories and studies
13
Transport planning
9
Tunnel design
12
Tunnel operations
11
Tunnel safety
10
Waterway design
10
Year
Year
2019
1
2016
1
2009
1
2008
1
2007
2
2006
2
Publication State
Publication State
Archived
Live
52
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 8 of 8 Publications
Bituminous mixes test methods
Remove Bituminous mixes test methods filter
Project planning
Remove Project planning filter
Archived
Remove Archived filter
Clear all filters
Clear all filters
Fully-matching results
Guide to Project Delivery Part 2: Planning and Control
AGPD02-14
Edition: 2.1
Superseded
23 Oct 2019
Project Delivery
1 results from the same Publication
More
Guide to Project Delivery consists of five parts. Part 2 gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase, as opposed to the preceding initiation phase and subsequent…
Characterisation of Flexural Stiffness and Fatigue Performance of Bituminous Mixes
AGPT-T274-16
Superseded
21 Jan 2016
Pavement
More
The test method specifies procedures for the characterisation of the stiffness and fatigue behaviour of bituminous mixtures using a four-point bending test configuration.
Guide to Project Delivery Part 1: Overview
AGPD01-09
Edition: 2
Superseded
1 Nov 2009
Project Delivery
More
The Austroads Guide to Project Delivery consists of four parts. Project delivery in a general sense may be described as the process by which the aim or goal of a project is realised or achieved. This part (Part 1) of the Guide explains the context…
Modified Surface Texture Depth (Pestle Method)
AGPT-T250-08
Superseded
1 Jun 2008
Pavement
More
This method describes the procedure for the determination of the surface texture depth of road surfaces, by the sand patch technique. This method is only applicable to surface texture depths greater than 0.3 mm. This method was developed from BS…
Guide to Project Delivery Part 1: Overview
AGPD01-07
Edition: 1
Superseded
1 Nov 2007
Project Delivery
More
The Austroads Guide to Project Delivery consists of four parts. Project delivery in a general sense may be described as the process by which the aim or goal of a project is realised or achieved.
Guide to Project Delivery Part 2: Project Delivery Planning and Control
AGPD02-07
Edition: 1
Superseded
1 Nov 2007
Project Delivery
More
This document gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase as opposed to the preceding initiation phase and subsequent operational phase of a project. It covers a…
Deformation Resistance of Asphalt Mixtures by the Wheel Tracking Test
AGPT-T231-06
Superseded
1 Jan 2006
Pavement
More
This document describes the procedures to be followed to test a sample of asphalt using a wheel tracking test device. The procedures can be carried out on prismatic specimens that have been manufactured in the laboratory, cut from an existing…
Verification Procedure for a Wheel Tracking Test Device
AGPT-T210-06
Superseded
1 Jan 2006
Pavement
More
This document describes the procedures to be followed to verify that a wheel tracking test device complies to the requirements of those devices permitted for use by Austroads Test Method AGPT-T231. The procedures are advisory rather than mandatory…
1
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No