Publications

Filter
Topic
Publication State
Showing 1 - 10 of 42 Publications
Supply of Recycled Crushed Glass Sand
Austroads Technical Specification ATS 3050 sets out the minimum requirements for the manufacture and supply of recycled crushed glass (RCG) for use in the following applications: As a granular material, including: bedding and haunching of pipes and…
Austroads Test Methods and Specifications
This document provides a hyperlinked list of the Austroads Test Methods and Specifications.
Webinar: Increasing the Use of Recycled Glass in Road Infrastructure
This webinar, presented by Dr James Grenfell and Dr Didier Bodin, focuses on the development of a specification on the supply of recycled crushed glass sand as part of a project to support increased use of recycled crushed glass (RCG) in road…
Crushing, Processing and Cleaning of Recycled Crushed Glass for Transport Infrastructure
The purpose of this guideline is to provide potential recyclers with the information they need to gain a better understanding of how recycled crushed glass (RCG) should be processed to make it fit-for-purpose for infrastructure applications. This…
Development of a Specification for Recycled Crushed Glass as a Sand Aggregate Replacement
This report presents the technical basis for the development of the Austroads technical specification and guideline for the use of recycled glass in bedding, backfilling material, concrete, road drainage, embankment fill, and landscaping…
Supply of Aggregate for Sprayed Seals
Austroads Technical Specification ATS 3120 sets out the requirements for the supply of aggregates used for sprayed bituminous surfacing work. The technical specification can also be downloaded as a Word document.
Calibration of Bitumen Sprayers: General Introduction and List of Methods
This test method provides an overview of the 
Calibration of Bitumen Sprayers: Volumetric Calibration of Bitumen Pumping Systems
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: 
Viscosity of Calibration Fluid
This test method sets out the procedure for validating the calibration fluid. The calibration fluid is used for volumetric calibration of bitumen sprayer pumps (AGPT/T531), and also for two methods of determining transverse distribution of bitumen…
Calibration of Bitumen Sprayers: Transverse Distribution by Fixed Pit Facility
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: general introduction and list of methods. It sets out the procedures for determining the transverse distribution of bitumen sprayers, and is based on…