Publications

Filter
Topic
Publication State
Showing 1 - 10 of 135 Publications
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Supply of Polymer Modified Binders
Austroads Technical Specification ATS 3110 sets out the requirements for the supply of polymer modified binders (PMBs) and crumb rubber modified binders for use in both sprayed sealing and asphalt applications. The technical specification can also…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Austroads Rejuvenator Evaluation Protocol for Increasing Asphalt Recycling
The use of reclaimed asphalt pavement (RAP) in new asphalt mixes is a common practice in Australia and New Zealand due to its many benefits. RAP contents are typically about 10&ndash
Development of the Austroads Rejuvenator Evaluation Protocol
This report describes research into the development of a draft Austroads evaluation protocol for rejuvenators. Rejuvenators are typically used to produce asphalt mixes containing high levels of reclaimed asphalt pavement (RAP). The report includes a…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
Managing the suspension bridge in Kangaroo Valley (Hampden Bridge)
The aim of this paper is to share the experience in managing the risks facing a 125 years old Hampden Bridge which is a unique road suspension bridge in Kangaroo Valley, New South Wales. It was built in 1897 and this is a load-deficient bridge which…
Sydney Gateway Viaduct Design Highlights
Sydney Gateway Stage 3 contains a 550m long Viaduct connecting the upgraded Qantas Drive with Sydney Airport domestic arrival and departure terminals. This paper will give an overview of some of the interesting and less conventional aspects of its…