Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Corporate
Freight
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
33
Conference Papers
45
Corporate Reports
1
Guides
1
Research Reports
7
Webinars
3
Topic
Topic
Active travel
91
Bicycles
102
Bridge assessment
Bridge barriers
98
Bridge components
144
Bridge construction
240
Bridge design
352
Bridge maintenance
180
Bridge management
196
Bridge materials
198
Bridge performance
149
Bridgeworks specifications
115
Cemented materials
95
Climate change
92
Concrete
143
Data management
91
Digital engineering (BIM)
97
Economic evaluation
91
Fibre reinforced polymer
100
Heavy vehicle access
95
Heavy vehicle weighing
92
Level of service
90
Materials testing
95
Network management
92
Network performance
91
Pedestrians
110
Performance based standards
90
Project governance
94
Public transport
92
Rail bridges
120
Recycled material
91
Road pricing
91
Rural and remote
94
Steel
115
Structure management
92
Structures management
117
Timber
94
Traffic controls
92
Waterway design
97
Year
Year
2022
33
2021
2
2020
5
2019
1
2018
2
2017
23
2016
1
2014
18
2011
5
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 90 Publications
Bridges
Remove Bridges filter
Bridge assessment
Remove Bridge assessment filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
ABC2022-056-22
18 Nov 2022
Bridges
More
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Strengthening Bridges of the West Gate Tunnel Project
ABC2022-026-22
18 Nov 2022
Bridges
More
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Assessment Methods for Historic Steel Truss Bridges
ABC2022-008-22
18 Nov 2022
Bridges
More
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
ABC2022-004-22
18 Nov 2022
Bridges
More
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
UAV-based multi-layered data collection methods and defection algorithms for Predictive Analutics and Bridge Asset Management
ABC2022-136-22
18 Nov 2022
Bridges
More
Traditional inspection procedure for condition assessment of bridge structures is laborious, dangerous, time-consuming, capital intensive and highly dependent on subjective human judgment. Subsequently, bridge asset owners pay a high price per…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
ABC2022-116-22
17 Nov 2022
Bridges
More
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…
To Achieve Durable and Sustainable Concrete
ABC2022-134-22
17 Nov 2022
Bridges
More
Asset owners are interested in the use of durable concrete to maximize design life of their structures and minimize Whole of Life Cost (WOLC) throughout. Similarly, most assets owners nowadays also require their assets to be sustainable and…
Case Study: Sustainability in Bridge Engineering - SH2 Wairoa River Bridge Cycleway Extension
ABC2022-114-22
17 Nov 2022
Bridges
More
State Highway 2 Wairoa River Bridge near Tauranga, constructed in 1966, is a 177m long post-tensioned concrete structure with mono pier columns supported on pile foundations. Adding a lightweight downstream cycleway extension in September 2020 has…
Adopting Probability-Based Bridge Assessments in Australasia
ABC2022-104-22
17 Nov 2022
Bridges
More
Outputs from bridge assessment to AS 5100.7 are deterministic, expressing safety as a subjective and conservative binary (yes/no) measure. With Australia and New Zealand seeing increases of road freight demand under finite bridge infrastructure…
Heavy vehicles and bridges: What the data is telling us?
ABC2022-066-22
17 Nov 2022
Bridges
More
Evidence gathered on some Queensland bridges has raised questions about what heavy vehicles are really doing to bridges. Visual evidence includes the deterioration of concrete bridge decks, headstock cracking, fatigue cracking, settlement of bridge…
1
2
3
4
5
Next
Latest Bridges news
10 Apr 2024
12th Austroads Bridge Conference to be held in Brisbane
27 Mar 2024
Austroads guidance on bridge maintenance and management updated
31 Oct 2023
New Austroads technical specifications on bridgeworks published
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No