Publications

Filter
Topic
Publication State
Showing 1 - 10 of 212 Publications
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Webinar: Update to the Guide to Bridge Technology Part 7
This webinar focuses on the recent update of Section 3 of the Austroads Guide to Bridge Technology Part 7.
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Webinar: National Harmonisation of Test Methods Used in Asphalt Performance Specifications
The asphalt industry is rapidly evolving, and it is widely accepted that prescriptive specifications are not necessarily well suited to take full advantage of the benefits that new and innovative technologies can provide. There is therefore a desire…
National Harmonisation of Test Methods Used in Asphalt Performance Specifications
This report documents the delivery of the first component of a new Austroads performance-related asphalt specification framework. This included the development of several new test methods and updating a number of existing test methods for use in…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Maintenance challenges with the heritage listed Old Murray Bridge
Old Murray Bridge is located east of the township of Murray Bridge and spans the River Murray and the river flats on the eastern side of the river. It was opened in 1879 and was the first permanent bridge crossing over the River Murray in South…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…