Publications

Filter
Topic
Publication State
Showing 1 - 10 of 406 Publications
Webinar: Update to the Guide to Bridge Technology Part 7
This webinar focuses on the recent update of Section 3 of the Austroads Guide to Bridge Technology Part 7.
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Practical Approaches for Managing Regional Road Safety Priorities: Practitioner Resources
This report details road and transport safety interventions that can reduce fatal and serious injury crashes in regional and remote areas. It contains the factsheets, prioritisation framework, and evaluation framework from the report Practical…
Practical Approaches for Managing Regional Road Safety Priorities
This report details road and transport safety interventions that can reduce fatal and serious injury crashes in regional and remote areas. A literature review expands on the Austroads National View on Regional and Remote Road Safety report by…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…
Maintenance challenges with the heritage listed Old Murray Bridge
Old Murray Bridge is located east of the township of Murray Bridge and spans the River Murray and the river flats on the eastern side of the river. It was opened in 1879 and was the first permanent bridge crossing over the River Murray in South…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
The design of asymmetric continuous twin U-trough rail viaduct with hybrid pre-stressing
Whiteman Park Viaduct is part of the new 21 km Morley-Ellenbrook Rail Line (MEL) from Bayswater to Ellenbrook, in the Perth Metropolitan area in Western Australia. The viaduct is required to elevate MEL at the Whiteman Park Station precinct to allow…