Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Economics and Financing
Freight
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
15
Research Reports
2
Technical Reports
1
Topic
Topic
Annual reports
19
Asphalt
21
Bicycles
24
Binders
21
Binders test methods
19
Bitumen
21
Bridge assessment
36
Bridge barriers
20
Bridge components
23
Bridge construction
44
Bridge design
64
Bridge maintenance
34
Bridge management
Bridge materials
33
Bridge performance
25
Capability assessment
19
Concrete
31
Cooperative ITS
19
Crash analysis
20
Data management
23
Driver licensing
19
Economic evaluation
Fibre reinforced polymer
18
Financing
19
Freight policy
19
Geotextiles
19
Granular materials
19
Heavy vehicle access
24
Heavy vehicle safety
19
Intelligent transport systems
21
Intersection design
19
Logistics
19
Materials testing
30
Motorcycles
19
Network management
19
Network performance
18
Pavement construction
19
Pavement design
28
Pavement management
28
Pavement performance
34
Pedestrians
23
Performance based standards
19
Prequalification
19
Process and documentation
20
Procurement
22
Project governance
20
Project planning
20
Rail bridges
27
Risk assessment
19
Roadside design
20
Rural and remote
19
Safe people
19
Safe roads
22
Safe System
20
Safety strategy
20
Seals
27
Smart motorways
20
Speed management
20
Steel
21
Strategic asset management
20
Structures management
22
Timber
20
Traffic operations
19
Waterway design
18
Year
Year
2024
20
2023
19
2022
45
2021
22
2020
22
2018
20
2017
39
2016
20
2015
22
2014
2012
19
2011
68
2009
21
2006
19
2005
19
2004
22
2003
26
2002
22
2001
22
2000
22
1999
19
1998
20
1997
20
1994
20
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 18 Publications
Bridge management
Remove Bridge management filter
Economic evaluation
Remove Economic evaluation filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Rural Bridge Cost Benefit Analysis and Inclusion Within an Investment Program
ABC-LCM203-14
22 Oct 2014
Bridges
More
Economic analysis can inform investment decisions around proposed bridge projects. This paper outlines the evaluative techniques and methodologies used in appraising a proposed bridge replacement and approach realignment project located in rural…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No