Publications

Filter
Topic
Publication State
Showing 1 - 10 of 152 Publications
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
Managing the suspension bridge in Kangaroo Valley (Hampden Bridge)
The aim of this paper is to share the experience in managing the risks facing a 125 years old Hampden Bridge which is a unique road suspension bridge in Kangaroo Valley, New South Wales. It was built in 1897 and this is a load-deficient bridge which…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Sydney Gateway Viaduct Design Highlights
Sydney Gateway Stage 3 contains a 550m long Viaduct connecting the upgraded Qantas Drive with Sydney Airport domestic arrival and departure terminals. This paper will give an overview of some of the interesting and less conventional aspects of its…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Assessment Methods for Historic Steel Truss Bridges
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Monash Freeway Upgrade - Warrigal Road Bridge Barrier Upgrade
The $761 million stage 2 of Monash Freeway Upgrade project involves the addition of 36 kilometres of new lanes to one of Melbourne's busiest freeways, as well as other upgrades at Beaconsfield interchange and O'Shea Road. As part of the project, the…