Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Materials
Pavement
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Technical Reports
1
Test Methods
4
Topic
Topic
Aggregate test methods
10
Aggregates
19
Asphalt
132
Binders
70
Binders test methods
30
Bitumen
73
Bituminous mixes test methods
33
Bridgeworks specifications
6
Cemented materials
13
Climate change
6
Concrete
22
Contracts
6
Crash analysis
6
Data management
7
Drainage
9
Earthworks
9
Earthworks and stormwater specifications
6
Equipment test methods
14
Foamed bitumen stabilisation
General specifications
6
Geotextiles
9
Granular materials
28
Guide review
9
Level of service
6
Materials handling
9
Materials testing
134
Other assets management
7
Pavement construction
31
Pavement design
167
Pavement investigation test methods
8
Pavement maintenance
37
Pavement management
51
Pavement materials
7
Pavement performance
233
Pavements specifications
20
Performance based standards
9
Process and documentation
6
Recycled material
35
Roadside furniture and miscellaneous test methods
6
Rural and remote
6
Safe roads
6
Safe strategy
6
Safety strategy
6
Seals
90
Stabilised materials
15
Strategic asset management
7
Traffic facilities and incidental construction specifications
6
Year
Year
2019
1
2017
4
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 5 of 5 Publications
Pavement
Remove Pavement filter
Foamed bitumen stabilisation
Remove Foamed bitumen stabilisation filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Deformation Performance of Foamed Bitumen Stabilised Pavements Under Full-scale Accelerated Loading
AP-T343-19
5 Mar 2019
Pavement
More
This report details the first phase of Austroads project TT2046 Improving the Cost Effectiveness of Foamed Bitumen Stabilised Pavements which evaluated the deformation performance of foamed bitumen stabilised materials
Determining the Foaming Characteristics of Bitumen
AGPT-T301-17
24 Oct 2017
Pavement
More
Foaming of bitumen permits the bitumen to be evenly distributed throughout a soil or a granular material. It is critical for the bitumen to remain as viable foam for a period to enable it to be successfully blended into the host material.
Resilient Modulus of Foamed Bitumen Stabilised Materials
AGPT-T305-17
24 Oct 2017
Pavement
More
This method describes the procedure for the laboratory determination of the resilient modulus of test cylinders of foamed bitumen stabilised mixes using repeat load indirect tensile techniques.
Mixing of Foamed Bitumen Stabilised Materials
AGPT-T302-17
24 Oct 2017
Pavement
More
This method describes the procedure for adding foamed bitumen to a granular material to produce foamed bitumen stabilised material. The method is applicable to materials with a maximum nominal particle size of 40 mm (i.e. 100% passing the 37.5 mm…
Compaction of Test Cylinders of Foamed Bitumen Stabilised Materials Part 1: Dynamic Compaction using Marshall Drop Hammer
AGPT-T303-17
24 Oct 2017
Pavement
More
This method describes the procedure for compacting cylindrical test specimens suitable for use in the determination of physical properties. The method is applicable to materials with a maximum nominal particle size of 40 mm (i.e. 100% passing the 37.…
1
Latest Pavement news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
5 Apr 2024
New technical report revises mix design procedure in light of laboratory compaction equipment changes
4 Apr 2024
Feasible alternatives to hydrated lime in asphalt mixes
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No