Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Corporate
Freight
Materials
Pavement
Project Delivery
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
2
Guides
3
Research Reports
10
Specifications
1
Technical Reports
132
Test Methods
12
Webinars
10
Work Tips
30
Topic
Topic
Active travel
232
Aggregates
206
Annual reports
215
Asphalt
263
Automated vehicle policy
218
Automated vehicle safety
227
Bicycles
256
Binders
224
Binders test methods
224
Bitumen
233
Bituminous mixes test methods
223
Bridge assessment
292
Bridge components
259
Bridge construction
356
Bridge design
473
Bridge maintenance
310
Bridge management
317
Bridge materials
311
Bridge performance
269
Bridgeworks specifications
248
Capability assessment
213
Cemented materials
209
Climate change
213
Community attitudes
213
Concrete
273
Congestion
216
Contracts
210
Cooperative ITS
231
Crash analysis
256
Data management
273
Design principles and process
227
Digital infrastructure
210
Drainage
215
Driver licensing
239
Drugs and alcohol
214
Economic evaluation
256
Electric vehicles
214
Equipment test methods
226
Financing
218
Freight modelling
215
Freight policy
232
Geometric design
232
Granular materials
209
Guide review
238
Heavy vehicle access
273
Heavy vehicle safety
247
Heavy vehicle weighing
217
Incident management
218
Intelligent transport systems
229
Intersection design
229
Land use
211
Level of service
223
Materials testing
Motorcycles
211
Network management
248
Network operations
229
Network performance
220
Older drivers
212
Other assets management
220
Pavement construction
221
Pavement design
282
Pavement investigation test methods
221
Pavement maintenance
241
Pavement management
283
Pavement performance
304
Pavements specifications
224
Pedestrians
257
Performance based standards
216
Process and documentation
213
Procurement
212
Project governance
212
Project planning
221
Public transport
225
Rail bridges
232
Recycled material
227
Road pricing
210
Roadside design
222
Rural and remote
231
Safe people
263
Safe roads
311
Safe System
253
Safe vehicles
245
Safety audit
215
Safety strategy
227
Seals
Speed management
249
Steel
228
Strategic asset management
249
Structures management
234
Temporary traffic management
224
Traffic and safety
216
Traffic controls
242
Traffic management
255
Traffic modelling
222
Traffic operations
223
Traffic theories and studies
214
Transport planning
224
Tunnel design
221
Tunnel operations
216
Tunnel safety
222
Year
Year
2024
2
2023
6
2022
15
2021
11
2020
5
2019
8
2018
5
2017
5
2016
6
2015
8
2014
15
2013
23
2012
13
2011
11
2010
9
2009
3
2008
17
2007
9
2006
13
2005
4
2004
2
2003
3
2002
2
2001
2
2000
3
Publication State
Publication State
Archived
3
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 200 Publications
Materials testing
Remove Materials testing filter
Seals
Remove Seals filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Taking Representative Samples of Bituminous Binders From Road Tankers from Sampling Points Only
AP-PWT56-24
13 May 2024
Pavement
More
This work tip provides guidance on binder sampling to ensure that consistent and reliably representative samples are obtained so that any test results: represent, as near as practicable, an average of a consignment or batch
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Cone Penetration of Hot Poured Joint Sealant
ATM-284-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the cone penetration of a joint sealant at 25 
Flow Properties of Hot Poured Joint Sealant
ATM-281-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the resistance of hot poured joint sealants to flow at a temperature of 70 °
1
2
3
4
5
Next
Latest news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
6 May 2024
Congratulations to Madeleine McManus OAM on receiving 2024 John Shaw Medal
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No