Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Freight
Materials
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
81
Conference Papers
246
Guides
7
Research Reports
5
Specifications
6
Technical Reports
11
Test Methods
3
Webinars
3
Topic
Topic
Active travel
362
Bicycles
362
Bridge assessment
441
Bridge barriers
368
Bridge components
392
Bridge construction
388
Bridge design
Bridge maintenance
446
Bridge management
458
Bridge materials
Bridge performance
397
Bridgeworks specifications
380
Cemented materials
362
Climate change
363
Concrete
368
Data management
363
Digital engineering (BIM)
365
Economic evaluation
363
Fibre reinforced polymer
363
Heavy vehicle access
375
Heavy vehicle weighing
364
Level of service
364
Materials testing
362
Network management
362
Network performance
363
Pedestrians
362
Performance based standards
365
Project governance
365
Public transport
362
Rail bridges
373
Recycled material
363
Road pricing
363
Rural and remote
366
Steel
368
Structure management
362
Structures management
386
Timber
367
Traffic controls
362
Waterway design
366
Year
Year
2022
81
2021
2
2020
9
2019
2
2018
7
2017
94
2016
4
2014
63
2013
1
2012
1
2011
92
2004
1
2003
1
2001
1
2000
2
1998
1
Publication State
Publication State
Archived
7
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 362 Publications
Bridges
Remove Bridges filter
Bridge design
Remove Bridge design filter
Bridge materials
Remove Bridge materials filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
ABC2022-081-22
18 Nov 2022
Bridges
More
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…
The Progression of Stable Unbonded-Fiber Reinforced Elastomeric Bearings
ABC2022-105-22
18 Nov 2022
Bridges
More
The progression to enhance the performance of elastomeric bearings has been an ongoing. The durability and seismic performance of elastomeric bearings are two areas where the implementation of fiber instead steel lamina may address these areas. A…
New methods for match cast segmental construction in Australia on the Grafton Bridge
ABC2022-096-22
18 Nov 2022
Bridges
More
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
ABC2022-084-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…
Panmure Busway Bridge
ABC2022-099-22
18 Nov 2022
Bridges
More
The Eastern Busway was commissioned by Auckland Transport to provide bus lanes, road upgrades and a walking &
West Gate Tunnel Project - Driven Precast Concrete Piles in Coode Island Silt
ABC2022-144-22
18 Nov 2022
Bridges
More
Driven precast concrete piles are the established value for money piling choice for a number of infrastructure projects in Australia. This paper looks at a large-scale application of precast driven concrete piles in a brownfield-site as part of West…
Modular Lightweight FRP Footbridges
ABC2022-091-22
18 Nov 2022
Bridges
More
Fibre reinforced polymer (FRP) footbridges were investigated by British Rail in the early 1980's due to the benefits of lightweight construction. FRP bridge applications have continued to be developed for railway infrastructure in the UK, including…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
ABC2022-112-22
18 Nov 2022
Bridges
More
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
1
2
3
4
5
Next
Latest Bridges news
10 Apr 2024
12th Austroads Bridge Conference to be held in Brisbane
27 Mar 2024
Austroads guidance on bridge maintenance and management updated
31 Oct 2023
New Austroads technical specifications on bridgeworks published
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No