Publications

Showing 1 - 5 of 5 Publications
Guide to Pavement Technology Part 6: Unsealed Pavements
Part 6 of the Guide to Pavement Technology addresses unsealed pavements including operational demands of unsealed road surfaces, pavement configurations, floodways, cuts, fills and mine haul roads, the identification of suitable pavement materials…
Guide to Pavement Technology Part 10: Subsurface Drainage
Part 10: Subsurface Drainage provides advice on the general requirements for drainage materials, design of pavement drains and construction and maintenance considerations. This Part contains information on the types and uses of subsurface drainage…
Guide to Pavement Technology Part 7: Pavement Maintenance
Guide to Pavement Technology Part 7: Pavement Maintenance provides broad guidance on current routine maintenance practices for sealed pavements suitable for use by both supervisory and field staff. 
Absorption of Bituminous Binder into Aggregate
This method describes the procedure for the determination of the quantity of binder absorbed by an aggregate. The volume of aggregate is determined from its bulk particle density in a saturated surface dry condition. The volume of binder free…
Average Least Dimension of Aggregate by Direct Measurement (Nominal Size 10mm and Greater)
This standard sets out the method for determining the Average Least Dimension (ALD) of aggregate particles by the use of vernier callipers or dial gauge or a slotted gauge. The method is applicable to aggregate of nominal size 10 mm and greater for…