Publications

Showing 1 - 5 of 5 Publications
Austroads Annual Report 2013-14
Each year Austroads produces an annual report which details its work program, operations and financial management.
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Guide to Project Delivery Part 1: Overview
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Guide to Project Delivery Part 4: Direct Management of Project Works
Guide to Project Delivery consists of five parts. Part 4 outlines appropriate standards of practice and procedures for the delivery of works by direct management. It assumes that the agency has committed to undertake works using a direct managed…