Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Economics and Financing
Environment
Materials
Pavement
Project Delivery
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
17
Conference Papers
37
Corporate Reports
2
Guides
6
Research Reports
16
Specifications
3
Technical Reports
70
Test Methods
8
Webinars
14
Webinars and Events
1
Work Tips
28
Topic
Topic
Active travel
235
Aggregates
218
Annual reports
217
Asphalt
Automated vehicle policy
220
Automated vehicle safety
229
Bicycles
258
Binders
249
Binders test methods
227
Bitumen
263
Bituminous mixes test methods
225
Bridge assessment
291
Bridge components
Bridge construction
348
Bridge design
453
Bridge maintenance
297
Bridge management
313
Bridge materials
311
Bridge performance
260
Bridgeworks specifications
248
Capability assessment
215
Cemented materials
214
Climate change
215
Community attitudes
215
Concrete
279
Congestion
218
Contracts
208
Cooperative ITS
233
Crash analysis
258
Data management
275
Design principles and process
229
Digital infrastructure
212
Drainage
217
Driver licensing
241
Drugs and alcohol
216
Economic evaluation
257
Electric vehicles
216
Equipment test methods
228
Financing
220
Freight modelling
218
Freight policy
234
Geometric design
234
Granular materials
224
Guide review
238
Heavy vehicle access
276
Heavy vehicle safety
250
Heavy vehicle weighing
219
Incident management
220
Intelligent transport systems
230
Intersection design
231
Land use
213
Level of service
225
Materials testing
295
Motorcycles
213
Network management
250
Network operations
231
Network performance
222
Older drivers
214
Other assets management
222
Pavement construction
224
Pavement design
310
Pavement investigation test methods
224
Pavement maintenance
243
Pavement management
302
Pavement performance
374
Pavements specifications
221
Pedestrians
260
Performance based standards
215
Process and documentation
Procurement
209
Project governance
214
Project planning
221
Public transport
227
Rail bridges
233
Recycled material
217
Road pricing
212
Roadside design
224
Rural and remote
233
Safe people
265
Safe roads
315
Safe System
256
Safe vehicles
247
Safety audit
217
Safety strategy
229
Seals
264
Speed management
251
Steel
228
Strategic asset management
251
Structures management
236
Temporary traffic management
226
Traffic and safety
218
Traffic controls
242
Traffic management
257
Traffic modelling
224
Traffic operations
225
Traffic theories and studies
216
Transport planning
226
Tunnel design
223
Tunnel operations
218
Tunnel safety
224
Year
Year
2024
6
2023
15
2022
30
2021
21
2020
2
2019
6
2018
2
2017
18
2016
3
2015
2
2014
10
2013
14
2012
4
2011
22
2010
6
2009
4
2008
8
2007
5
2006
8
2005
1
2004
5
2003
3
2002
2
2001
3
1998
1
1994
1
Publication State
Publication State
Archived
7
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 202 Publications
Asphalt
Remove Asphalt filter
Bridge components
Remove Bridge components filter
Process and documentation
Remove Process and documentation filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
WEB-R708-24
8 Apr 2024
Pavement
More
Moisture damage in asphalt (also known as stripping) can significantly reduce the durability and strength of asphalt pavements, often resulting in expensive repairs. Hydrated lime is widely used in Australia to reduce the moisture susceptibility of…
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
WEB-T376-24
4 Apr 2024
Pavement
More
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
AP-R708-24
3 Apr 2024
Pavement
More
Hydrated lime is widely used in Australia to reduce the moisture susceptibility of asphalt mixes in service. However, the local asphalt industry is concerned about the sustainability of the continued use of hydrated lime in asphalt. This report…
Validation of Superpave™ Method of Asphalt Compaction for Australasia
AP-T376-24
3 Apr 2024
Pavement
More
This report details the testing of 21 Austroads jurisdictions mixes and one airport mix to develop a relationship between the Austroads Gyropac Gyratory compactor, which is now redundant, and the Servopac (setup to AS/NZS) and Superpave Gyratory…
Optimising Project Delivery Performance (Accelerated Projects)
AP-R706-24
29 Jan 2024
Project Delivery
More
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No