Publications

Filter
Topic
Publication State
Showing 1 - 7 of 7 Publications
Guidelines for the Evaluation and Reporting of Automated Vehicle Trials
These guidelines set out the key stages associated with evaluation and reporting of automated vehicle trials including: scoping and planning
Guide to Project Delivery Part 2: Planning and Control
Guide to Project Delivery Part 2: Planning and Control gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase, as opposed to the preceding initiation phase and subsequent…
Interim Guidelines for the Use of Recycled Waste Plastic in Local Government Road Surfacing Applications
As a result of the ban on the export of recycled waste plastic, there is increasing interest in repurposing recycled waste plastic for use in road surfacing applications. There is no guide for this purpose and until such time as a guide is available…
Guide to Pavement Technology Part 4F: Bituminous Binders
Guide to Pavement Technology Part 4F: Bituminous Bindersprovides guidance on the use of bituminous materials in road construction and maintenance. Bituminous materials include bitumen obtained from refining crude petroleum oil and products derived…
Guide to Project Delivery Part 1: Overview
The Guide to Project Delivery consists of five parts. Part 1 explains the context of project delivery in relation to the asset management functions and strategic planning process and its role and importance within the overall project management…
Building and Construction Procurement Guide: Principles and Options
Austroads and the Australasian Procurement and Construction Council's (APCC) 
Guide to Pavement Technology Part 4L: Stabilising Binders
Stabilisation may be defined as a process by which the intrinsic properties of a pavement material are altered by the addition of a stabilisation binder to meet performance expectations in its operating, geological and climatic environment. Part 4L…