Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Assessing Fitness to Drive
Asset Management
Bridges
Connected and Automated Vehicles
Freight
Materials
Project Delivery
Registration and Licensing
Road Safety
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
44
Conference Papers
100
Corporate Reports
1
Guides
7
Research Reports
21
Specifications
3
Technical Reports
8
Webinars
15
Topic
Topic
Active travel
232
Aggregates
215
Annual reports
214
Asphalt
328
Automated vehicle policy
Automated vehicle safety
217
Bicycles
248
Binders
265
Binders test methods
224
Bitumen
271
Bituminous mixes test methods
230
Bridge assessment
288
Bridge components
248
Bridge construction
Bridge design
350
Bridge maintenance
295
Bridge management
308
Bridge materials
303
Bridge performance
254
Bridgeworks specifications
244
Capability assessment
213
Cemented materials
213
Climate change
213
Community attitudes
212
Concrete
276
Congestion
215
Contracts
209
Cooperative ITS
227
Crash analysis
253
Data management
268
Design principles and process
224
Digital infrastructure
207
Drainage
214
Driver licensing
230
Drugs and alcohol
Economic evaluation
253
Electric vehicles
211
Equipment test methods
225
Financing
217
Freight modelling
215
Freight policy
231
Geometric design
231
Granular materials
222
Guide review
238
Heavy vehicle access
269
Heavy vehicle safety
246
Heavy vehicle weighing
216
Incident management
217
Intelligent transport systems
228
Intersection design
228
Land use
210
Level of service
222
Materials testing
337
Motorcycles
210
Network management
247
Network operations
228
Network performance
219
Older drivers
209
Other assets management
219
Pavement construction
228
Pavement design
361
Pavement investigation test methods
221
Pavement maintenance
243
Pavement management
301
Pavement performance
436
Pavements specifications
224
Pedestrians
244
Performance based standards
215
Process and documentation
213
Procurement
209
Project governance
Project planning
214
Public transport
222
Rail bridges
219
Recycled material
232
Road pricing
209
Roadside design
221
Rural and remote
227
Safe people
253
Safe roads
311
Safe System
253
Safe vehicles
243
Safety audit
214
Safety strategy
226
Seals
287
Speed management
248
Steel
224
Strategic asset management
248
Structures management
233
Temporary traffic management
223
Traffic and safety
215
Traffic controls
237
Traffic management
253
Traffic modelling
221
Traffic operations
221
Traffic theories and studies
213
Transport planning
223
Tunnel design
220
Tunnel operations
215
Tunnel safety
221
Year
Year
2024
1
2023
5
2022
53
2021
3
2020
10
2018
6
2017
41
2016
1
2015
2
2014
28
2012
1
2011
35
2004
1
2003
2
2001
1
2000
4
1998
3
1995
1
1992
1
Publication State
Publication State
Archived
9
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 199 Publications
Automated vehicle policy
Remove Automated vehicle policy filter
Bridge construction
Remove Bridge construction filter
Drugs and alcohol
Remove Drugs and alcohol filter
Project governance
Remove Project governance filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Webinar: Optimising Project Delivery Performance – Accelerated Projects
WEB-R706-23
27 Feb 2024
Project Delivery
More
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Webinar: Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
WEB-R696-23
18 Oct 2023
Connected and Automated Vehicles
More
Join us for a webinar that delves into the latest on connected and automated vehicles (CAVs) and the pivotal role that interaction with physical infrastructure plays in their integration into our transport system. In this session, we will present a…
Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
AP-R696-23
17 Oct 2023
Connected and Automated Vehicles
More
This report identifies and discusses physical infrastructure practices that Austroads member agencies could change to improve connected and automated vehicle (CAV) support. It incorporates a review of previous Austroads publications that…
Guidelines for the trials of automated vehicles in Australia 2023
AP-C101-23
Edition: 3.0
18 Sep 2023
Connected and Automated Vehicles
More
These guidelines set out criteria that must be addressed in any application for an automated vehicle trial. The guidelines aim to provide clear guidance on matters that should be addressed by trialling organisations as part of the trialling process…
Guidelines for the Evaluation and Reporting of Automated Vehicle Trials
AP-G102-23
Edition: 1.0
27 Jul 2023
Connected and Automated Vehicles
More
These guidelines set out the key stages associated with evaluation and reporting of automated vehicle trials including: scoping and planning
Webinar: 2022 Winners of the Austroads Bridge Awards
WEB-ABAW-23
28 Feb 2023
Asset Management
More
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No