Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Project Delivery
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
14
Guides
2
Research Reports
2
Technical Reports
3
Work Tips
1
Topic
Topic
Annual reports
23
Asphalt
25
Bicycles
28
Binders
Binders test methods
23
Bitumen
24
Bridge assessment
40
Bridge barriers
24
Bridge components
27
Bridge construction
48
Bridge design
68
Bridge maintenance
38
Bridge management
Bridge materials
37
Bridge performance
29
Capability assessment
23
Concrete
35
Cooperative ITS
23
Crash analysis
24
Data management
27
Driver licensing
23
Economic evaluation
25
Fibre reinforced polymer
22
Financing
23
Freight policy
23
Geotextiles
23
Granular materials
23
Heavy vehicle access
28
Heavy vehicle safety
24
Intelligent transport systems
24
Intersection design
23
Logistics
23
Materials testing
32
Motorcycles
23
Network management
23
Network performance
22
Pavement construction
23
Pavement design
31
Pavement management
32
Pavement performance
36
Pedestrians
27
Performance based standards
23
Prequalification
23
Process and documentation
22
Procurement
Project governance
23
Project planning
22
Rail bridges
31
Risk assessment
23
Roadside design
24
Rural and remote
24
Safe people
23
Safe roads
26
Safe System
24
Safety strategy
24
Seals
30
Smart motorways
24
Speed management
24
Steel
25
Strategic asset management
24
Structures management
26
Timber
24
Traffic operations
23
Waterway design
22
Year
Year
2024
25
2023
25
2022
52
2021
30
2020
27
2019
27
2018
25
2017
46
2016
23
2015
26
2014
2013
31
2012
28
2011
67
2010
28
2009
24
2008
24
2007
23
2006
26
2004
25
2003
23
2002
25
2001
23
2000
24
1998
24
Publication State
Publication State
Archived
1
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 22 Publications
Binders
Remove Binders filter
Bridge management
Remove Bridge management filter
Procurement
Remove Procurement filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
What next for bridges?
ABC-IAR102-14
22 Oct 2014
Bridges
More
Bridge design is an ancient art. The principles for overcoming gravity, supporting people and vehicles and the best use of the materials at hand have evolved but are rooted in antiquity. In contrast with this stability we are perhaps going through…
1
2
3
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No