Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
44
Test Methods
7
Topic
Topic
Active travel
54
Aggregates
54
Alcohol interlocks
52
Annual reports
52
Asphalt
64
Assessing Fitness to Drive
54
Automated vehicle policy
56
Automated vehicle safety
52
Bicycles
53
Binders
55
Binders test methods
Bitumen
60
Bituminous mixes test methods
59
Bridge assessment
82
Bridge barriers
52
Bridge components
66
Bridge construction
Bridge design
88
Bridge maintenance
80
Bridge management
73
Bridge materials
73
Bridge performance
68
Bridgeworks specifications
55
Capability assessment
53
Climate change
54
Concrete
57
Congestion
53
Contracts
53
Data management
58
Digital infrastructure
53
Drainage
54
Driver licensing
55
Drugs and alcohol
53
Earthworks
54
Economic evaluation
54
Electric vehicles
56
Freight modelling
53
Freight policy
53
Guide review
57
Heavy vehicle access
53
Heavy vehicle safety
53
Hydrogen vehicles
53
Incident management
53
Materials testing
60
Network management
54
Network operations
53
Older drivers
53
Pavement design
55
Pavement investigation test methods
52
Pavement maintenance
52
Pavement performance
57
Pavements specifications
54
Pedestrians
54
Prequalification
52
Procurement
53
Project governance
53
Project planning
56
Public transport
54
Recycled material
65
Roadside design
55
Rural and remote
52
Safe people
56
Safe roads
61
Safe System
54
Safe vehicles
53
Safety audit
54
Safety programs
52
Safety strategy
52
Seals
57
Smart motorways
53
Speed management
55
Stabilised materials
54
Strategic asset management
52
Structures management
52
Temporary traffic management
53
Traffic controls
56
Traffic management
54
Transport planning
52
Tunnel design
55
Tunnel operations
54
Tunnel safety
56
Year
Year
2023
55
2022
2021
56
2020
55
2019
55
2018
53
2017
92
2016
53
2015
52
2014
78
2012
52
2011
84
2010
52
2006
54
2003
52
2001
52
2000
53
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 51 Publications
Binders test methods
Remove Binders test methods filter
Bridge construction
Remove Bridge construction filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
New methods for match cast segmental construction in Australia on the Grafton Bridge
ABC2022-096-22
18 Nov 2022
Bridges
More
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
ABC2022-084-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…
Effects of increasing Limestone content of cement on concrete performance
ABC2022-052-22
18 Nov 2022
Bridges
More
In attempts to reduce the CO2 footprint of the construction industry, technologies have been developed in the past for the replacement of Portland cement by other materials, such as supplementary cementitious materials (SCMs), which have had the…
Granite Island Causeway Replacement Project
ABC2022-062-22
18 Nov 2022
Bridges
More
The Granite Island Causeway is a key piece of South Australian infrastructure of cultural and heritage significance. It is an iconic landmark for local tourism, used for the historic horse drawn tram services and for recreational pedestrian and…
Bridges of the West Gate Tunnel Project
ABC2022-025-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project is one of Australia's largest infrastructure projects currently under construction and will give Melbourne an alternative to the West Gate Bridge. The scope includes: Two three-lane road tunnels, Widening of the West…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No