Publications

Filter
Topic
Publication State
Showing 1 - 10 of 159 Publications
Webinar: Update to the Guide to Bridge Technology Part 7
This webinar focuses on the recent update of Section 3 of the Austroads Guide to Bridge Technology Part 7.
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Austroads Test Methods and Specifications
This document provides a hyperlinked list of the Austroads Test Methods and Specifications.
Extractions of Bituminous Binder from Asphalt
This method has been developed for extracting bituminous binders from bituminous mixtures i.e. asphalt field samples, loose plant mix or reclaimed asphalt pavement.
Characterisation of the Viscosity of Reclaimed Asphalt Pavement (RAP) Binder Using the Dynamic Shear Rheometer (DSR)
The test method sets out the procedure for the determination of viscosity of binders recovered from RAP source materials, as well as of virgin binders and rejuvenators.
Harmonising Road Safety Audit Practices
Road safety audit practices across Australia and New Zealand vary considerably. Transport agencies in both countries have expressed an appetite for a harmonised approach. Austroads project SAG6343 has developed a framework to harmonise road safety…
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Maintenance challenges with the heritage listed Old Murray Bridge
Old Murray Bridge is located east of the township of Murray Bridge and spans the River Murray and the river flats on the eastern side of the river. It was opened in 1879 and was the first permanent bridge crossing over the River Murray in South…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…