Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Materials
Pavement
Road Safety
Test Methods and Specifications
Tunnels
Search publications library
Filter
Open/Close All Filters
Type
Type
Guides
1
Research Reports
2
Test Methods
7
Webinars
2
Topic
Topic
Active travel
15
Aggregates
15
Alcohol interlocks
13
Annual reports
13
Asphalt
20
Assessing Fitness to Drive
15
Automated vehicle policy
17
Automated vehicle safety
13
Bicycles
14
Binders
16
Binders test methods
19
Bitumen
20
Bituminous mixes test methods
Bridge assessment
45
Bridge barriers
14
Bridge components
29
Bridge construction
56
Bridge design
80
Bridge maintenance
45
Bridge management
36
Bridge materials
41
Bridge performance
31
Bridgeworks specifications
16
Capability assessment
14
Climate change
15
Concrete
18
Congestion
14
Contracts
14
Data management
19
Digital infrastructure
14
Drainage
15
Driver licensing
16
Drugs and alcohol
14
Earthworks
15
Economic evaluation
15
Electric vehicles
17
Freight modelling
14
Freight policy
14
Guide review
18
Heavy vehicle access
14
Heavy vehicle safety
14
Hydrogen vehicles
14
Incident management
14
Materials testing
18
Network management
15
Network operations
14
Older drivers
14
Pavement design
16
Pavement investigation test methods
13
Pavement maintenance
13
Pavement performance
18
Pavements specifications
15
Pedestrians
15
Prequalification
13
Procurement
14
Project governance
14
Project planning
17
Public transport
15
Recycled material
26
Roadside design
16
Rural and remote
12
Safe people
16
Safe roads
19
Safe System
14
Safe vehicles
13
Safety audit
14
Safety programs
12
Safety strategy
12
Seals
14
Smart motorways
14
Speed management
Stabilised materials
15
Strategic asset management
13
Structures management
13
Temporary traffic management
14
Traffic controls
17
Traffic management
15
Transport planning
13
Tunnel design
14
Tunnel operations
15
Tunnel safety
15
Year
Year
2024
13
2023
19
2022
2021
17
2020
19
2019
16
2018
17
2016
16
2015
14
2014
14
2013
14
2012
13
2011
14
2010
16
2009
17
2006
18
2005
17
2003
14
2001
13
2000
14
1996
13
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 12 Publications
Bituminous mixes test methods
Remove Bituminous mixes test methods filter
Speed management
Remove Speed management filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Webinar: Standards Australia – Bitumen and Related Materials for Roads
WEB-ASB-22
13 Sep 2022
Pavement
More
In Australia and New Zealand, bituminous binders used in road construction are tested prior to use to ensure they will perform satisfactorily during road construction/maintenance. Some of the Australian Standards that are used for these tests have…
Cone Penetration of Hot Poured Joint Sealant
ATM-284-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the cone penetration of a joint sealant at 25 
Flow Properties of Hot Poured Joint Sealant
ATM-281-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the resistance of hot poured joint sealants to flow at a temperature of 70 °
Preparation of Hot Poured Joint Sealant for Laboratory Testing
ATM-280-22
4 Aug 2022
Test Methods and Specifications
More
This test method sets out the procedure to be used to prepare joint sealant samples for testing.
Heat Degradation of Hot Poured Joint Sealant
ATM-283-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the degree to which a joint sealant is degraded by heat during prolonged storage (6 
Best Practice Speed Information Management
AP-R671-22
7 Jun 2022
Road Safety
More
This report summarises the findings of a review of current practices relating to speed information management (i.e. speed limits and operating speeds) in Austroads jurisdictions. As speed information management is an emerging topic, current…
Webinar: Perceptual Countermeasure Treatments to Reduce Crash Risks in Tunnels
WEB-R668-22
29 Mar 2022
Tunnels
More
Road tunnels are major pieces of infrastructure across the road network, and the number of tunnels is expected to increase in the coming years. Although they are relatively safe, a significant number of crashes occur on the approaches to and within…
Use of Perceptual Countermeasure Treatments to Reduce Crash Risks in Tunnels
AP-R668-22
17 Feb 2022
Tunnels
More
This report evaluates selected low-cost perceptual countermeasure (PCM) treatments in tunnel environments. PCM treatments are used to reduce crash risk by improving driver speed behaviour, alertness and lane discipline within tunnels. Two key…
Verification Procedure for the Four-point Bending Test
ATM-239-22
15 Feb 2022
Test Methods and Specifications
More
The characterisation of the flexural stiffness and fatigue behaviour of bituminous mixtures in Australia and New Zealand is undertaken using a four-point bending (4PB) configuration. This document describes the procedures to be followed to verify…
Stripping Potential of Asphalt – Tensile Strength Ratio
ATM-232-22
15 Feb 2022
Test Methods and Specifications
More
This test method sets out procedures for the preparation of asphalt specimens and measuring the change in indirect tensile strength resulting from the effects of moisture and freeze/thaw conditioning. The results can be used to assess the propensity…
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No