Publications

Filter
Topic
Publication State
Showing 1 - 10 of 108 Publications
Webinar: Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
Join us for a webinar that delves into the latest on connected and automated vehicles (CAVs) and the pivotal role that interaction with physical infrastructure plays in their integration into our transport system. In this session, we will present a…
Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
This report identifies and discusses physical infrastructure practices that Austroads member agencies could change to improve connected and automated vehicle (CAV) support. It incorporates a review of previous Austroads publications that…
Guidelines for the trials of automated vehicles in Australia 2023
These guidelines set out criteria that must be addressed in any application for an automated vehicle trial. The guidelines aim to provide clear guidance on matters that should be addressed by trialling organisations as part of the trialling process…
Guidelines for the Evaluation and Reporting of Automated Vehicle Trials
These guidelines set out the key stages associated with evaluation and reporting of automated vehicle trials including: scoping and planning
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
UAV-based multi-layered data collection methods and defection algorithms for Predictive Analutics and Bridge Asset Management
Traditional inspection procedure for condition assessment of bridge structures is laborious, dangerous, time-consuming, capital intensive and highly dependent on subjective human judgment. Subsequently, bridge asset owners pay a high price per…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…