Australia and New Zealand Roads Capability Analysis: March 2024 Update
The Australia and New Zealand Roads Capability Analysis: March 2024 Update provides a half-year update to the report published by Austroads in September 2023. It evaluates the skills and capabilities required by Austroads member agencies in the next…
Webinar: Australia and New Zealand Roads Capability Analysis 2022-2032
Following previous workforce capability studies undertaken in 2006, 2009, 2013 and 2017, Austroads engaged Oxford Economics Australia to undertake a new workforce capability analysis for member authorities based on planned and forecasted…
Australia and New Zealand Roads Capability Analysis 2022-2032: March 2024 Update
This report evaluates the skills and capabilities required by Austroads member agencies in the next decade to achieve their service objectives. It compares these requirements with the current and projected future workforce, identifies potential…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Birkenhead Bridge Bascule Span Deck Replacement
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…