Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Freight
Road Design
Road Safety
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
33
Research Reports
3
Topic
Topic
Annual reports
37
Asphalt
39
Bicycles
42
Binders
39
Binders test methods
37
Bitumen
39
Bridge assessment
Bridge barriers
38
Bridge components
40
Bridge construction
61
Bridge design
81
Bridge maintenance
54
Bridge management
49
Bridge materials
Bridge performance
40
Capability assessment
37
Concrete
39
Cooperative ITS
37
Crash analysis
38
Data management
41
Driver licensing
37
Economic evaluation
39
Fibre reinforced polymer
36
Financing
37
Freight policy
37
Geotextiles
37
Granular materials
37
Heavy vehicle access
38
Heavy vehicle safety
38
Intelligent transport systems
39
Intersection design
37
Logistics
37
Materials testing
48
Motorcycles
37
Network management
37
Network performance
37
Pavement construction
37
Pavement design
46
Pavement management
46
Pavement performance
52
Pedestrians
41
Performance based standards
36
Prequalification
37
Process and documentation
38
Procurement
40
Project governance
38
Project planning
38
Rail bridges
44
Risk assessment
37
Roadside design
Rural and remote
38
Safe people
37
Safe roads
38
Safe System
38
Safety strategy
38
Seals
45
Smart motorways
38
Speed management
38
Steel
37
Strategic asset management
38
Structures management
40
Timber
37
Traffic operations
37
Waterway design
37
Year
Year
2023
40
2022
100
2021
42
2020
54
2019
42
2018
40
2017
87
2016
39
2015
37
2014
2013
37
2012
37
2011
63
2010
37
2004
37
1998
37
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 36 Publications
Bridge assessment
Remove Bridge assessment filter
Bridge materials
Remove Bridge materials filter
Roadside design
Remove Roadside design filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
An Investigation into Graphitic Corrosion of Cast Iron Bridge Piers
ABC-AAI401-14
22 Oct 2014
Bridges
More
Cast iron was extensively used in bridge piers in early metal bridges in Australia. These cast iron bridge piers have performed well against atmospheric corrosion. However, the portion immersed in water suffers from graphitic corrosion, a form of…
Evaluation and Strengthening of Existing Bridges to Carry Increased Vehicle Weights
ABC-AAI405-14
22 Oct 2014
Bridges
More
Detailed investigation and live-load evaluation was undertaken for several 1930s reinforced concrete bridges followed by strengthening where required.
Movable Span Bridges of NSW: A New Classification System
ABC-AAI104-14
22 Oct 2014
Bridges
More
NSW Roads and Maritime Services manage 26 movable span bridges of which 11 are still operational. These bridges were the subject of a recently completed study undertaken jointly by RMS and GHD Newcastle which focused on the components of each bridge…
Proposed Revisions to AS 5100 Part 5: Concrete
ABC-AUS104-14
22 Oct 2014
Bridges
More
Since the introduction of the current Bridge Design Standard in 2004 there have been real advances in both design and construction methods and in materials technology. The Part 5 Standards Australia Sub-Committee (BD090-05) has responded to this…
Time-Variant Performance Indicators for Concrete Bridges Exposed to Corrosion
ABC-IAM102-14
22 Oct 2014
Bridges
More
The life-cycle performance of concrete bridges exposed to corrosion is investigated based on a set of time-variant probabilistic performance indicators including structural reliability, redundancy, robustness and resilience. The performance…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Long-Term Performance of Concrete Bridges Under Extreme Events
ABC-IAM101-14
22 Oct 2014
Bridges
More
Reinforced concrete (RC) structures in a marine environment deteriorate with time due to chloride-induced corrosion of reinforcing bars. Corrosion is initiated by chloride contamination if the structures have poor quality concrete and/or inadequate…
Seismic Assessment and Strengthening of Reinforced Earth Bridge Abutment and Approach Walls
ABC-AAI303-14
22 Oct 2014
Bridges
More
The Ngauranga Interchange is located at the intersection of two State Highways that provide the only highway access from the surrounding regions to the city of Wellington, New Zealand. Reinforced Earth® walls retain the seaward side of the off-ramp…
Condition Assessment and Load Rating of Arched Bailey Bridge
ABC-AAI302-14
22 Oct 2014
Bridges
More
The Bailey bridge system was originally invented for military usage during World War II. Since then, it has been used to meet emergency or temporary bridge needs. It has also been widely used as a permanent solution for pedestrian and road bridge…
Anzac Bridge Maintenance Project: Bridge-Specific Assessment of Live Load
ABC-AAI301-14
22 Oct 2014
Bridges
More
Sydneys ANZAC Bridge was recently the subject of a maintenance project which addressed four main areas to improve the future performance of the structure. These areas were: stay cable improvements
1
2
3
4
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No