Publications

Showing 1 - 10 of 85 Publications
Shear in Prestressed Concrete I-girder Bridges
Prestressed concrete I girder bridges constructed in the 1960s and 70s have the potential to restrict transport productivity because their AS 5100.7 assessments can be poor despite satisfactory inservice performance. The primary issue is the shear…
Management of Heavy Vehicle Access to Bridges
Australia has regularly reviewed access to the road and bridge network with a view to increasing transport productivity. The current access regime for heavy vehicles has evolved over time with access now controlled by a range of regulations, notices,…
The Challenges Faced in Assessing the Durability Risks of Reinforced Concrete Bridges in Aggressive Environments
Durability assessment is increasingly becoming an integral part of infrastructure design projects in Australia. One of the key drivers for this is the requirement by asset owners for optimum whole of life cost, minimum construction period and…
Introduction of E Class Trams on Melbourne's Tram Network and the Impact on VicRoads' Bridges
Over recent years, Public Transport Victoria through its operator Yarra Trams, has been gradually introducing new class trams (of which the E Class is the heaviest and longest) on Melbourne’s tram network.
A Drift and Displacement Based Seismic Assessment Method for Bridge Abutments
The present study is concerned with the drift and displacement based seismic assessment of bridge abutments. This study is distinguished from previous research that has been reported in the literature in that what is of primary interests is the…
The Torsional Strengthening of Concrete Girders Using the NSM FRP Technique with Different Configurations
The near-surface mounted (NSM) FRP technique has received attention worldwide over the externally bonded FRP strengthening technique. Strengthening of a concrete girders using fiber reinforced polymer (FRP) composites to flexural and shear…
Operational and Inventory Management of Bridges
Theoretical assessments of a bridge network to AS5100.7 identify many bridges operating at margins smaller than those embodied in AS 5100.7. The cost of strengthening these bridges is unpalatable and the consequences of restricting access are…
Bridge Design Challenges on the Waikato Expressway Huntly Section, New Zealand
The Huntly Section is a new NZ$415M section of the Waikato Expressway running between Hamilton and Auckland. It will connect the recently completed Ngaruawahia and Ohinewai sections on a route that traverses the Taupiri Ranges within a deep cutting…
Strength Enhancement of Fire-damaged RC Circular Bridge Columns using CFRP Fabrics
In recent years the circumferential wrapping with externally-bonded carbon fibre-reinforced polymer (CFRP) composites has proven to be a promising method for strengthening concrete structures. This is particularly valuable when repairing concrete…
Revision of Australian Standard AS 5100 Part 7: Bridge Assessment
The change in title of the 2004 Australian Standard AS 5100 Part 7 Rating to the revised AS 5100 Part 7 Bridge Assessment is symbolic of the change of focus of this part of the standard. The 2004 version of the standard had an objective “to…