Publications

Filter
Topic
Publication State
Showing 1 - 10 of 134 Publications
Webinar: Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
Join us for a webinar that delves into the latest on connected and automated vehicles (CAVs) and the pivotal role that interaction with physical infrastructure plays in their integration into our transport system. In this session, we will present a…
Harmonising Road Safety Audit Practices
Road safety audit practices across Australia and New Zealand vary considerably. Transport agencies in both countries have expressed an appetite for a harmonised approach. Austroads project SAG6343 has developed a framework to harmonise road safety…
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: Zebras and Wombats: Factchecking 'False Sense of Security'
Decisions on how transport agencies provide for people walking to safely cross the roads has been greatly influenced by historical research, that has in the past failed to examine the infrastructure design and lacked behavioural data. This webinar,…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Assessment Methods for Historic Steel Truss Bridges
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
UAV-based multi-layered data collection methods and defection algorithms for Predictive Analutics and Bridge Asset Management
Traditional inspection procedure for condition assessment of bridge structures is laborious, dangerous, time-consuming, capital intensive and highly dependent on subjective human judgment. Subsequently, bridge asset owners pay a high price per…