Publications

Filter
Topic
Publication State
Showing 1 - 10 of 108 Publications
Webinar: National Telematics Framework: Setting a Benchmark for Intelligent Access
For over a decade, the National Telematics Framework has been setting a benchmark as an effective regulatory framework for optimised vehicle movements, making Australia a world-leader in intelligent access management. The National Telematics…
Webinar: Australian 3G Network Shutdown
Between December 2023 and September 2024, Telstra, Optus and Vodafone will close their 3G networks to make room for new, faster services. The 3G network shutdown will affect vital equipment and services across the road transport sector. Devices that…
Webinar: NSW’s Transition to Smart On-Board Mass for PBS Mass Monitoring
Transport for NSW (TfNSW) is transitioning from Interim On-Board Mass (OBM) management to Smart OBM. All Performance Based Standards (PBS) vehicle operators with mass monitoring as a condition of access will need to transition to the more advanced…
Webinar: Victorian Government’s Enrolment of Smart OBM
The Department of Transport and Planning Victoria has announced 30 June 2023 as the final deadline to have smart on-board mass (OBM) systems fitted to certain high productivity freight vehicles (HPFVs). Beyond this date, the mass limits of the below…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Queensland’s Transition from IAP to TMA
The Queensland Department of Transport and Main Roads has announced upcoming changes which will harmonise the use of National Telematics Framework applications for heavy vehicles in Queensland with other jurisdictions. These changes will include…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Assessment Methods for Historic Steel Truss Bridges
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…