Publications

Filter
Topic
Publication State
Showing 1 - 10 of 147 Publications
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Webinar: National Harmonisation of Test Methods Used in Asphalt Performance Specifications
The asphalt industry is rapidly evolving, and it is widely accepted that prescriptive specifications are not necessarily well suited to take full advantage of the benefits that new and innovative technologies can provide. There is therefore a desire…
National Harmonisation of Test Methods Used in Asphalt Performance Specifications
This report documents the delivery of the first component of a new Austroads performance-related asphalt specification framework. This included the development of several new test methods and updating a number of existing test methods for use in…
Webinar: Austroads National Harmonisation of Temporary Traffic Management Practice – Update
In this webinar, Chris Koniditsiotis, Lead Implementation Consultant and Patsy Thomas, National Temporary Traffic Management (TTM) Operations Manager provide an update on the implementation and operational commencement of the Austroads National…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Standardised Signage and Pavement Symbols for Low and Zero Emission Vehicles
This report, published in January 2022, provides a basis for future testing and standardisation of the symbols and road signage for low and zero emission vehicles in Australia and New Zealand, paving the way to adopt consistent symbols in the road…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
Strengthening Bridges of the West Gate Tunnel Project
In addition to providing the southern hemisphere's largest-diameter tunnel as an alternative major Yarra River crossing to ease congestion on the 50-year-old West Gate Bridge, the West Gate Tunnel Project is also one of Australia's largest bridge…
Assessment Methods for Historic Steel Truss Bridges
New Zealand has many historic and significant steel truss road and rail bridges, with the majority of these constructed between early 1900s to mid-1960s. Steel truss bridges are able to span long distances, and bridge members commonly include…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…