Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Corporate
Freight
Materials
Pavement
Project Delivery
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
33
Conference Papers
49
Corporate Reports
1
Guides
6
Research Reports
13
Specifications
1
Technical Reports
42
Test Methods
5
Webinars
14
Work Tips
28
Topic
Topic
Active travel
224
Aggregates
202
Annual reports
207
Asphalt
296
Automated vehicle policy
210
Automated vehicle safety
219
Bicycles
248
Binders
234
Binders test methods
216
Bitumen
249
Bituminous mixes test methods
218
Bridge assessment
Bridge components
248
Bridge construction
344
Bridge design
454
Bridge maintenance
285
Bridge management
298
Bridge materials
304
Bridge performance
251
Bridgeworks specifications
240
Capability assessment
205
Cemented materials
206
Climate change
205
Community attitudes
205
Concrete
272
Congestion
208
Contracts
201
Cooperative ITS
223
Crash analysis
248
Data management
264
Design principles and process
218
Digital infrastructure
202
Drainage
207
Driver licensing
231
Drugs and alcohol
206
Economic evaluation
248
Electric vehicles
206
Equipment test methods
218
Financing
210
Freight modelling
207
Freight policy
224
Geometric design
224
Granular materials
213
Guide review
231
Heavy vehicle access
253
Heavy vehicle safety
239
Heavy vehicle weighing
209
Incident management
210
Intelligent transport systems
221
Intersection design
221
Land use
203
Level of service
213
Materials testing
304
Motorcycles
203
Network management
240
Network operations
221
Network performance
212
Older drivers
204
Other assets management
212
Pavement construction
214
Pavement design
319
Pavement investigation test methods
214
Pavement maintenance
233
Pavement management
287
Pavement performance
385
Pavements specifications
216
Pedestrians
249
Performance based standards
205
Process and documentation
205
Procurement
202
Project governance
Project planning
207
Public transport
216
Rail bridges
222
Recycled material
225
Road pricing
202
Roadside design
213
Rural and remote
223
Safe people
255
Safe roads
303
Safe System
245
Safe vehicles
237
Safety audit
207
Safety strategy
219
Seals
Speed management
241
Steel
218
Strategic asset management
241
Structures management
225
Temporary traffic management
216
Traffic and safety
208
Traffic controls
234
Traffic management
247
Traffic modelling
214
Traffic operations
215
Traffic theories and studies
206
Transport planning
216
Tunnel design
212
Tunnel operations
208
Tunnel safety
214
Year
Year
2024
2
2023
7
2022
41
2021
11
2020
10
2019
8
2018
5
2017
26
2016
4
2015
3
2014
29
2013
6
2012
3
2011
9
2010
4
2009
1
2008
5
2006
5
2005
4
2004
2
2002
1
2001
2
2000
3
1998
1
Publication State
Publication State
Archived
7
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 192 Publications
Bridge assessment
Remove Bridge assessment filter
Project governance
Remove Project governance filter
Seals
Remove Seals filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Optimising Project Delivery Performance – Accelerated Projects
WEB-R706-23
27 Feb 2024
Project Delivery
More
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Webinar: 2022 Winners of the Austroads Bridge Awards
WEB-ABAW-23
28 Feb 2023
Asset Management
More
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
ABC2022-056-22
18 Nov 2022
Bridges
More
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No