Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Materials
Pavement
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
16
Research Reports
3
Technical Reports
10
Topic
Topic
Annual reports
30
Asphalt
31
Bicycles
35
Binders
30
Binders test methods
30
Bitumen
32
Bridge assessment
47
Bridge barriers
Bridge components
34
Bridge construction
55
Bridge design
74
Bridge maintenance
45
Bridge management
Bridge materials
44
Bridge performance
36
Capability assessment
30
Concrete
40
Cooperative ITS
30
Crash analysis
31
Data management
34
Driver licensing
30
Economic evaluation
32
Fibre reinforced polymer
29
Financing
30
Freight policy
30
Geotextiles
30
Granular materials
29
Heavy vehicle access
35
Heavy vehicle safety
31
Intelligent transport systems
32
Intersection design
30
Logistics
30
Materials testing
Motorcycles
30
Network management
30
Network performance
29
Pavement construction
29
Pavement design
32
Pavement management
34
Pavement performance
33
Pedestrians
34
Performance based standards
30
Prequalification
30
Process and documentation
31
Procurement
33
Project governance
31
Project planning
31
Rail bridges
38
Risk assessment
30
Roadside design
31
Rural and remote
31
Safe people
30
Safe roads
33
Safe System
31
Safety strategy
31
Seals
32
Smart motorways
31
Speed management
31
Steel
32
Strategic asset management
31
Structures management
33
Timber
31
Traffic operations
30
Waterway design
29
Year
Year
2024
32
2023
30
2022
62
2021
34
2020
31
2019
35
2018
32
2017
59
2016
34
2015
35
2014
2013
52
2012
41
2011
84
2010
34
2009
32
2008
43
2007
38
2006
38
2004
31
2003
32
2002
32
2000
30
1998
30
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 29 Publications
Bridge barriers
Remove Bridge barriers filter
Bridge management
Remove Bridge management filter
Materials testing
Remove Materials testing filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Proposed Methodology for Upgrading Bridge Barriers
ABC-MAR104-14
22 Oct 2014
Bridges
More
The AS 5100 Standard provides requirements for multiple-performance-level barriers. Historical barriers constructed before 1970 generally do not meet modern requirements for safety. This paper builds on ongoing previous research projects within…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
1
2
3
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No