Publications

Filter
Publication State
Showing 1 - 10 of 17 Publications
National ITS Architecture: ITS Business Architecture
A key initial step in the development of the National ITS Architecture for Australia is to build the conceptual ITS Business Architecture platform on which subsequent and more detailed architectural models can be built.
National ITS Architecture: Context and Vision
The proposed Australian National ITS Architecture is intended to allow transport agencies and ITS–related organisations describe and develop ITS solutions using a consistent terminology and content.
The Revision of AS 5100.4: Bearings and Deck Joints
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Inelastic Displacement-Based Seismic Design of Balanced Cantilever Bridges With Mid-Length Joints
Ideally, a balanced cantilever bridge is built with its superstructure continuous between the abutments. For long bridges, mid-length expansion joints may be necessary. The separation of expansion joints may be maximised by supporting the…
Anzac Cable Stayed Bridge Health Monitoring
Roads and Maritime Services of Transport for NSW in collaboration with the Bridge Solution Alliance formed by Freyssinet, Lend Lease and Sage Automation undertook a major maintenance project to solve stay cable vibrations, strengthening-related…
Modular Joint Testing for the Hunter Expressway
Modular bridge expansion joints (MBEJs) are widely used throughout the world for the provision of controlled pavement continuity during seismic, thermal expansion, contraction and long-term creep and shrinkage movements of bridge superstructures.…
West Gate Bridge: Refurbishment of Demag Expansion Joint and Roller Bearings
Melbourne’s West Gate Bridge, first opened to traffic in 1978, is around 2.5 km long and comprises an 848 m long five-span steel box girder portion over the Yarra River and two continuous concrete box girder approach viaducts 871 m and 670 m long.…
Double/Double Primerseal Inspections

This report describes inspections conducted on double/double primerseals constructed in Victoria.

It is not typical practice to use two-layer primerseals, or polymer modification in primerseals, and methods to do so are not described by Austroads…

Inspections of Sprayed Seal Trials

This report details the findings from visual inspections conducted on two Austroads sprayed seal field trials: a non-modified binders trial near Gisborne,

Initial Field Trials with Surface Wear Rig

A mobile pavement surface wear rig has been constructed, which aims to gain an improved understanding of the failure mechanisms that are particular to the pavement surfacing layer – as distinct from the structural layers – that may be caused by…