Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
56
Research Reports
1
Topic
Topic
Annual reports
58
Asphalt
60
Bicycles
62
Binders
60
Binders test methods
58
Bitumen
60
Bridge assessment
69
Bridge barriers
59
Bridge components
60
Bridge construction
Bridge design
83
Bridge maintenance
Bridge management
Bridge materials
70
Bridge performance
64
Capability assessment
58
Concrete
69
Cooperative ITS
58
Crash analysis
59
Data management
62
Driver licensing
58
Economic evaluation
60
Fibre reinforced polymer
57
Financing
58
Freight policy
58
Geotextiles
58
Granular materials
58
Heavy vehicle access
61
Heavy vehicle safety
59
Intelligent transport systems
60
Intersection design
58
Logistics
58
Materials testing
69
Motorcycles
58
Network management
58
Network performance
57
Pavement construction
58
Pavement design
67
Pavement management
67
Pavement performance
73
Pedestrians
61
Performance based standards
58
Prequalification
58
Process and documentation
59
Procurement
61
Project governance
59
Project planning
59
Rail bridges
60
Risk assessment
58
Roadside design
59
Rural and remote
59
Safe people
58
Safe roads
61
Safe System
59
Safety strategy
59
Seals
66
Smart motorways
59
Speed management
59
Steel
59
Strategic asset management
59
Structures management
61
Timber
58
Traffic operations
58
Waterway design
57
Year
Year
2024
59
2023
58
2022
139
2021
61
2020
62
2018
59
2017
128
2016
58
2015
58
2014
2012
59
2011
140
2004
59
2003
58
2002
59
2001
58
2000
59
1998
58
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 57 Publications
Bridge construction
Remove Bridge construction filter
Bridge maintenance
Remove Bridge maintenance filter
Bridge management
Remove Bridge management filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
Investigation of Post-Flood-Damage Bridges, RMS Perspective
ABC-LCM302-14
22 Oct 2014
Bridges
More
In the last few years, severe weather changes were experienced in all parts of Australia. One of the severe weather changes is seen in the form of flooding, causing damage not only to the roads but bridges. Flooding along with high velocity flow…
Cost-Effective Method of Surface Preparation for Bridges in the Future
ABC-LCM102-14
22 Oct 2014
Bridges
More
High performance paint coatings of modern days require the prepared surface to have Sa 21/2 (very thorough blast cleaning) or higher class of finish. Dry abrasive blasting easily meets this requirement resulting in adequate bonding of the paint…
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
ABC-DES301-14
22 Oct 2014
Bridges
More
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No