Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
72
Topic
Topic
Active travel
75
Aggregates
75
Alcohol interlocks
73
Annual reports
73
Asphalt
85
Assessing Fitness to Drive
75
Automated vehicle policy
77
Automated vehicle safety
73
Bicycles
74
Binders
76
Binders test methods
79
Bitumen
81
Bituminous mixes test methods
80
Bridge assessment
97
Bridge barriers
73
Bridge components
85
Bridge construction
Bridge design
106
Bridge maintenance
Bridge management
82
Bridge materials
89
Bridge performance
88
Bridgeworks specifications
76
Capability assessment
74
Climate change
75
Concrete
78
Congestion
74
Contracts
74
Data management
79
Digital infrastructure
74
Drainage
75
Driver licensing
76
Drugs and alcohol
74
Earthworks
75
Economic evaluation
75
Electric vehicles
77
Freight modelling
74
Freight policy
74
Guide review
78
Heavy vehicle access
74
Heavy vehicle safety
74
Hydrogen vehicles
74
Incident management
74
Materials testing
81
Network management
75
Network operations
74
Older drivers
74
Pavement design
76
Pavement investigation test methods
73
Pavement maintenance
73
Pavement performance
78
Pavements specifications
75
Pedestrians
75
Prequalification
73
Procurement
74
Project governance
74
Project planning
77
Public transport
75
Recycled material
86
Road pricing
Roadside design
76
Rural and remote
73
Safe people
77
Safe roads
82
Safe System
75
Safe vehicles
74
Safety audit
75
Safety programs
73
Safety strategy
73
Seals
78
Smart motorways
74
Speed management
76
Stabilised materials
75
Strategic asset management
73
Structures management
73
Temporary traffic management
74
Traffic controls
77
Traffic management
75
Transport planning
73
Tunnel design
76
Tunnel operations
75
Tunnel safety
77
Year
Year
2023
73
2022
2021
76
2020
77
2018
73
2017
126
2016
74
2014
125
2012
75
2011
130
2007
74
2003
74
2002
73
2001
74
2000
74
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 72 Publications
Bridge construction
Remove Bridge construction filter
Bridge maintenance
Remove Bridge maintenance filter
Road pricing
Remove Road pricing filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Granite Island Causeway Replacement Project
ABC2022-062-22
18 Nov 2022
Bridges
More
The Granite Island Causeway is a key piece of South Australian infrastructure of cultural and heritage significance. It is an iconic landmark for local tourism, used for the historic horse drawn tram services and for recreational pedestrian and…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
ABC2022-112-22
18 Nov 2022
Bridges
More
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
Birkenhead Bridge Bascule Span Deck Replacement
ABC2022-013-22
18 Nov 2022
Bridges
More
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
ABC2022-051-22
18 Nov 2022
Bridges
More
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
ABC2022-021-22
18 Nov 2022
Bridges
More
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…
1
2
3
4
5
Next
Latest news
3 Jun 2024
Austroads Safety Hardware Training and Accreditation Scheme Mandatory 1 July
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No