Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
73
Topic
Topic
Active travel
76
Aggregates
76
Alcohol interlocks
74
Annual reports
74
Asphalt
86
Assessing Fitness to Drive
76
Automated vehicle policy
78
Automated vehicle safety
74
Bicycles
75
Binders
77
Binders test methods
80
Bitumen
82
Bituminous mixes test methods
81
Bridge assessment
98
Bridge barriers
74
Bridge components
86
Bridge construction
Bridge design
107
Bridge maintenance
Bridge management
83
Bridge materials
90
Bridge performance
89
Bridgeworks specifications
77
Capability assessment
75
Climate change
76
Concrete
79
Congestion
75
Contracts
75
Data management
80
Digital infrastructure
75
Drainage
76
Driver licensing
77
Drugs and alcohol
75
Earthworks
76
Economic evaluation
76
Electric vehicles
78
Freight modelling
75
Freight policy
75
Guide review
79
Heavy vehicle access
75
Heavy vehicle safety
75
Hydrogen vehicles
75
Incident management
75
Materials testing
82
Network management
76
Network operations
75
Older drivers
75
Pavement design
77
Pavement investigation test methods
74
Pavement maintenance
74
Pavement performance
79
Pavements specifications
76
Pedestrians
76
Prequalification
74
Procurement
75
Project governance
75
Project planning
78
Public transport
76
Recycled material
87
Roadside design
77
Rural and remote
74
Safe people
78
Safe roads
83
Safe System
76
Safe vehicles
75
Safety audit
76
Safety programs
74
Safety strategy
74
Seals
79
Smart motorways
75
Speed management
77
Stabilised materials
76
Strategic asset management
74
Structures management
74
Temporary traffic management
75
Traffic controls
78
Traffic management
76
Transport planning
74
Tunnel design
77
Tunnel operations
76
Tunnel safety
78
Year
Year
2023
74
2022
2021
77
2020
78
2018
74
2017
126
2016
74
2014
126
2012
74
2011
129
2003
74
2002
74
2001
74
2000
75
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 73 Publications
Bridge construction
Remove Bridge construction filter
Bridge maintenance
Remove Bridge maintenance filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Granite Island Causeway Replacement Project
ABC2022-062-22
18 Nov 2022
Bridges
More
The Granite Island Causeway is a key piece of South Australian infrastructure of cultural and heritage significance. It is an iconic landmark for local tourism, used for the historic horse drawn tram services and for recreational pedestrian and…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
ABC2022-112-22
18 Nov 2022
Bridges
More
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
Birkenhead Bridge Bascule Span Deck Replacement
ABC2022-013-22
18 Nov 2022
Bridges
More
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
ABC2022-051-22
18 Nov 2022
Bridges
More
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
ABC2022-021-22
18 Nov 2022
Bridges
More
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No