Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Economics and Financing
Environment
Freight
Materials
Network
Pavement
Project Delivery
Road Safety
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
61
Conference Papers
120
Corporate Reports
3
Guides
5
Research Reports
37
Specifications
3
Technical Reports
21
Webinars
4
Topic
Topic
Active travel
287
Aggregates
270
Annual reports
269
Asphalt
383
Automated vehicle policy
272
Automated vehicle safety
281
Bicycles
303
Binders
320
Binders test methods
279
Bitumen
326
Bituminous mixes test methods
285
Bridge assessment
336
Bridge components
295
Bridge construction
Bridge design
392
Bridge maintenance
343
Bridge management
348
Bridge materials
346
Bridge performance
Bridgeworks specifications
299
Capability assessment
268
Cemented materials
268
Climate change
268
Community attitudes
267
Concrete
321
Congestion
270
Contracts
260
Cooperative ITS
285
Crash analysis
308
Data management
327
Design principles and process
281
Digital infrastructure
264
Drainage
269
Driver licensing
293
Drugs and alcohol
268
Economic evaluation
308
Electric vehicles
268
Equipment test methods
280
Financing
272
Freight modelling
270
Freight policy
286
Geometric design
286
Granular materials
277
Guide review
293
Heavy vehicle access
323
Heavy vehicle safety
300
Heavy vehicle weighing
270
Incident management
272
Intelligent transport systems
Intersection design
283
Land use
265
Level of service
273
Materials testing
392
Motorcycles
265
Network management
301
Network operations
283
Network performance
274
Older drivers
266
Other assets management
272
Pavement construction
283
Pavement design
416
Pavement investigation test methods
276
Pavement maintenance
298
Pavement management
356
Pavement performance
491
Pavements specifications
279
Pedestrians
301
Performance based standards
269
Process and documentation
Procurement
260
Project governance
264
Project planning
273
Public transport
275
Rail bridges
271
Recycled material
287
Road pricing
263
Roadside design
276
Rural and remote
285
Safe people
316
Safe roads
365
Safe System
308
Safe vehicles
299
Safety audit
269
Safety strategy
281
Seals
341
Speed management
302
Steel
279
Strategic asset management
303
Structures management
280
Temporary traffic management
278
Traffic and safety
270
Traffic controls
294
Traffic management
308
Traffic modelling
276
Traffic operations
276
Traffic theories and studies
268
Transport planning
278
Tunnel design
275
Tunnel operations
270
Tunnel safety
276
Year
Year
2024
1
2023
2
2022
61
2021
4
2020
3
2019
2
2018
2
2017
49
2016
7
2015
2
2014
40
2013
4
2012
7
2011
43
2010
2
2009
1
2008
1
2007
3
2006
1
2005
1
2004
4
2003
6
2002
2
2001
1
2000
2
1999
1
1998
1
1994
1
Publication State
Publication State
Archived
3
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 254 Publications
Bridge construction
Remove Bridge construction filter
Bridge performance
Remove Bridge performance filter
Intelligent transport systems
Remove Intelligent transport systems filter
Process and documentation
Remove Process and documentation filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Optimising Project Delivery Performance (Accelerated Projects)
AP-R706-24
29 Jan 2024
Project Delivery
More
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Webinar: 2022 Winners of the Austroads Bridge Awards
WEB-ABAW-23
28 Feb 2023
Asset Management
More
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Code of Practice for the Management of Alkali Aggregate Reactivity Template
AP-C112-23
Edition: 1.0
19 Jan 2023
Test Methods and Specifications
More
The Code of Practice for the Management of Alkali Aggregate Reactivity template has been developed for the use of Austroads member agencies. The document outlines the management strategies, testing and approval process required to regulate alkali…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
High Workability Concrete - Verification of Properties and Performance Criteria
ABC2022-068-22
18 Nov 2022
Bridges
More
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
ABC2022-130-22
18 Nov 2022
Bridges
More
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No