Publications

Filter
Publication State
Showing 1 - 10 of 46 Publications
Accelerated Evaluation of the Effectiveness of Supplementary Cementitious Materials to Suppress Damaging AAR Expansion in Concrete Structures

This report provides the results of testing of three potentially reactive aggregates by the accelerated mortar bar test (AMBT) and the concrete prism test (CPT).

The tests were conducted using reference mixes, which contained plain Portland cement as…

Webinar: Investigating the Potential Benefits of Enhanced End to End Supply Chain Visibility
This webinar, presented on 15 August 2017, provides an overview of the tangible benefits to the Australian economy that efforts to improve supply chain visibility can bring. In March 2017 Austroads released a report quantifying the benefits of…
Heavy Vehicle Horizontal Stresses and Pavement Surface Performance

This report presents the findings of Austroads Project AT1540 Understanding the impact on pavement surfaces from next generation freight vehicles and developing practical network prediction models and responses. The main purpose of the project was…

Austroads LTPP/LTPPM Study - Summary Report 2015-16

This report provides a summary of activities completed during 2015–16 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…

Revised Interim Works Effect Models

This study sought to extend the understanding of pavement works effects (WE) by extending the scope of WE treatments and evaluation measures previously used.

The study was based on data extracted from Austroads long?term pavement performance (LTPP)…

Webinar: Future Challenges of Changing Agricultural Equipment
This webinar addresses the road safety and infrastructure challenges posed by the operation of agricultural vehicles and equipment on public roads. It is presented by Adam Ritzinger, lead author of the 2016 Austroads report Future Challenges of…
Citylink Tulla Widening Project English Street Bridge Demolition and Construction
As part of the CityLink Tulla Widening (CTW) project, the English Street Bridge will be reconstructed to accommodate the widened Tullamarine Freeway and improve access to Essendon Fields. The reconstructed English Street Bridge will be a single span…
Strengthening of Bridges for Higher Productivity Freight Vehicles
Currently there is pressure from the freight industry to allow higher performance freight vehicles (HPFV) the use of major transport routes, particularly between the major centres of Brisbane, Melbourne and Sydney. An initial review of the existing…
Strengthening and Widening of the Maribyrnong River Bridges
The Maribyrnong River Bridges (also known as E.J. Whitten Bridge), is Victoria’s second largest road bridge being a 520 m long ten span structure that carries the M80 Ring Road over the Maribyrnong River in the outer western suburbs of Melbourne.…
Design and Construction of Rail Grade Separations for an Accelerated Construction Program
The Level Crossing Removal Project Package 1 (LCRP1) has successfully achieved its goal in Connecting Communities through the removal of four level crossings in record time by lowering the rail under road. The simultaneous removal of three of these…