Publications

Filter
Topic
Publication State
Showing 1 - 10 of 301 Publications
Australia and New Zealand Roads Capability Analysis: March 2024 Update
The Australia and New Zealand Roads Capability Analysis: March 2024 Update provides a half-year update to the report published by Austroads in September 2023. It evaluates the skills and capabilities required by Austroads member agencies in the next…
Webinar: Australia and New Zealand Roads Capability Analysis 2022-2032
Following previous workforce capability studies undertaken in 2006, 2009, 2013 and 2017, Austroads engaged Oxford Economics Australia to undertake a new workforce capability analysis for member authorities based on planned and forecasted…
Australia and New Zealand Roads Capability Analysis 2022-2032: March 2024 Update
This report evaluates the skills and capabilities required by Austroads member agencies in the next decade to achieve their service objectives. It compares these requirements with the current and projected future workforce, identifies potential…
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Standardised Signage and Pavement Symbols for Low and Zero Emission Vehicles
This report, published in January 2022, provides a basis for future testing and standardisation of the symbols and road signage for low and zero emission vehicles in Australia and New Zealand, paving the way to adopt consistent symbols in the road…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
The design of asymmetric continuous twin U-trough rail viaduct with hybrid pre-stressing
Whiteman Park Viaduct is part of the new 21 km Morley-Ellenbrook Rail Line (MEL) from Bayswater to Ellenbrook, in the Perth Metropolitan area in Western Australia. The viaduct is required to elevate MEL at the Whiteman Park Station precinct to allow…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…