Publications

Filter
Publication State
Showing 1 - 10 of 73 Publications
Webinar: Community Service Obligations Framework for the Roads Sector
This webinar, presented on 29 June 2017, provides an overview of how Community Service Obligations could be applied to the roads sector and how establishing a CSO framework could help clarify road funding arrangements. Community service obligations…
Webinar: Future Challenges of Changing Agricultural Equipment
This webinar addresses the road safety and infrastructure challenges posed by the operation of agricultural vehicles and equipment on public roads. It is presented by Adam Ritzinger, lead author of the 2016 Austroads report Future Challenges of…
Strengthening of Bridges for Higher Productivity Freight Vehicles
Currently there is pressure from the freight industry to allow higher performance freight vehicles (HPFV) the use of major transport routes, particularly between the major centres of Brisbane, Melbourne and Sydney. An initial review of the existing…
Design and Constructability Challenges of Strengthening Existing Bridges
The exponential rise of the population and freight load in Victoria have led to a strong need for the upgrade of existing infrastructure to accommodate the increase in demand and loads of high productivity heavy vehicles. In many instances,…
Citylink Tulla Widening Project English Street Bridge Demolition and Construction
As part of the CityLink Tulla Widening (CTW) project, the English Street Bridge will be reconstructed to accommodate the widened Tullamarine Freeway and improve access to Essendon Fields. The reconstructed English Street Bridge will be a single span…
Management of Heavy Vehicle Access to Bridges
Australia has regularly reviewed access to the road and bridge network with a view to increasing transport productivity. The current access regime for heavy vehicles has evolved over time with access now controlled by a range of regulations, notices,…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
Strengthening and Widening of the Maribyrnong River Bridges
The Maribyrnong River Bridges (also known as E.J. Whitten Bridge), is Victoria’s second largest road bridge being a 520 m long ten span structure that carries the M80 Ring Road over the Maribyrnong River in the outer western suburbs of Melbourne.…
Angellala Creek Bridge: Explosion to Bridge Reconstruction with a BIM Future
On the night of 5th September 2014 a road-train transporting 52 tonnes of ammonium nitrate crashed next to the Angellala Creek Bridge. The bridge is approximately 30km south of Charleville, on the Mitchell Highway in outback Queensland. The incident…
Design and Construction of Rail Grade Separations for an Accelerated Construction Program
The Level Crossing Removal Project Package 1 (LCRP1) has successfully achieved its goal in Connecting Communities through the removal of four level crossings in record time by lowering the rail under road. The simultaneous removal of three of these…