Publications

Filter
Topic
Publication State
Showing 1 - 10 of 327 Publications
Austroads Extended Vehicle Classification Scheme for Traffic and Transport Surveys
Austroads extended vehicle classification scheme builds on the influential 1994 scheme. The extended scheme provides greater granularity across the 12 classes in the 1994 scheme. It also provides a new classes for: active transport to address the…
Webinar: Austroads National Harmonisation of Temporary Traffic Management Practice – Update
In this webinar, Chris Koniditsiotis, Lead Implementation Consultant and Patsy Thomas, National Temporary Traffic Management (TTM) Operations Manager provide an update on the implementation and operational commencement of the Austroads National…
Multimodal Incident Management: Reference Architecture
This report presents a set of reference architecture models, content and guidance for use by road agencies to identify, plan and improve their Multimodal Incident Management (MMIM) capabilities. MMIM is defined as the resolution of an unplanned…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Australasian Pedestrian Facility Selection Tool [V2.2.2]: User Guide
This user guide describes the operation and outputs of the Australasian Pedestrian Crossing Facility Selection Web Tool This guide describes the user interface of the tool, including: how to access the tool the types of facilities that can and…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
The design of asymmetric continuous twin U-trough rail viaduct with hybrid pre-stressing
Whiteman Park Viaduct is part of the new 21 km Morley-Ellenbrook Rail Line (MEL) from Bayswater to Ellenbrook, in the Perth Metropolitan area in Western Australia. The viaduct is required to elevate MEL at the Whiteman Park Station precinct to allow…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…