Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Road Safety
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
31
Research Reports
2
Topic
Topic
Annual reports
34
Asphalt
36
Bicycles
39
Binders
36
Binders test methods
34
Bitumen
36
Bridge assessment
45
Bridge barriers
35
Bridge components
37
Bridge construction
59
Bridge design
79
Bridge maintenance
Bridge management
Bridge materials
47
Bridge performance
40
Capability assessment
34
Concrete
46
Cooperative ITS
34
Crash analysis
35
Data management
38
Driver licensing
34
Economic evaluation
35
Fibre reinforced polymer
33
Financing
34
Freight policy
34
Geotextiles
34
Granular materials
34
Heavy vehicle access
37
Heavy vehicle safety
35
Intelligent transport systems
36
Intersection design
34
Logistics
34
Materials testing
45
Motorcycles
34
Network management
34
Network performance
33
Pavement construction
34
Pavement design
43
Pavement management
43
Pavement performance
49
Pedestrians
38
Performance based standards
34
Prequalification
34
Process and documentation
35
Procurement
37
Project governance
35
Project planning
35
Rail bridges
40
Risk assessment
34
Roadside design
35
Rural and remote
Safe people
34
Safe roads
37
Safe System
35
Safety strategy
35
Seals
42
Smart motorways
35
Speed management
34
Steel
35
Strategic asset management
35
Structures management
37
Timber
34
Traffic operations
34
Waterway design
33
Year
Year
2024
35
2023
36
2022
77
2021
35
2020
38
2019
36
2018
37
2017
68
2016
35
2015
35
2014
2013
34
2012
34
2011
89
2010
37
2009
35
2007
34
2006
34
2004
35
2002
35
2001
34
2000
36
1998
34
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 33 Publications
Bridge maintenance
Remove Bridge maintenance filter
Bridge management
Remove Bridge management filter
Rural and remote
Remove Rural and remote filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
Investigation of Post-Flood-Damage Bridges, RMS Perspective
ABC-LCM302-14
22 Oct 2014
Bridges
More
In the last few years, severe weather changes were experienced in all parts of Australia. One of the severe weather changes is seen in the form of flooding, causing damage not only to the roads but bridges. Flooding along with high velocity flow…
Cost-Effective Method of Surface Preparation for Bridges in the Future
ABC-LCM102-14
22 Oct 2014
Bridges
More
High performance paint coatings of modern days require the prepared surface to have Sa 21/2 (very thorough blast cleaning) or higher class of finish. Dry abrasive blasting easily meets this requirement resulting in adequate bonding of the paint…
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
ABC-DES301-14
22 Oct 2014
Bridges
More
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
1
2
3
4
Next
Latest news
3 Jun 2024
Austroads Safety Hardware Training and Accreditation Scheme Mandatory 1 July
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No