Publications

Filter
Topic
Publication State
Showing 1 - 10 of 157 Publications
Webinar: Driving Data Potential: Exploring the Country's Road Network in the Digital Atlas of Australia
This webinar explores how the Digital Atlas is transforming the way we access and use location data. It discusses the National Roads dataset – a comprehensive dataset on Australia’s roads, now freely accessible to the public.
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: Multimodal Incident Management – Reference Architecture
Austroads has developed a set of reference architecture models, content and guidance for use by road agencies to identify, plan and improve their multimodal incident management (MMIM) capabilities. MMIM is the resolution of an unplanned incident…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Birkenhead Bridge Bascule Span Deck Replacement
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…
Bridge Strengthening for New Class Trams and Road Vehicle Loadings
As a part of an ongoing overall strategic plan to improve High Productivity Freight Vehicles and tram access to the Victorian road network, the Victorian Government committed funding for the strengthening of four tram-road bridges in Melbourne to…
Granite Island Causeway Replacement Project
The Granite Island Causeway is a key piece of South Australian infrastructure of cultural and heritage significance. It is an iconic landmark for local tourism, used for the historic horse drawn tram services and for recreational pedestrian and…