Publications

Filter
Topic
Publication State
Showing 1 - 10 of 159 Publications
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Guide to Pavement Technology Part 2: Pavement Structural Design
Guide to Pavement Technology Part 2: Pavement Structural Design provides advice for the structural design of sealed road pavements. The advice has been generally developed from the approaches followed by the Austroads member agencies. However, as it…
Webinar: Update to the Guide to Bridge Technology Part 7
This webinar focuses on the recent update of Section 3 of the Austroads Guide to Bridge Technology Part 7.
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Webinar: Australia and New Zealand Roads Capability Analysis 2022-2032
Following previous workforce capability studies undertaken in 2006, 2009, 2013 and 2017, Austroads engaged Oxford Economics Australia to undertake a new workforce capability analysis for member authorities based on planned and forecasted…
Australia and New Zealand Roads Capability Analysis 2022-2032
This report evaluates the skills and capabilities required by Austroads member agencies in the next decade to achieve their service objectives. It compares these requirements with the current and projected future workforce, identifies potential…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Maintenance challenges with the heritage listed Old Murray Bridge
Old Murray Bridge is located east of the township of Murray Bridge and spans the River Murray and the river flats on the eastern side of the river. It was opened in 1879 and was the first permanent bridge crossing over the River Murray in South…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…