Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Materials
Network
Pavement
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
14
Research Reports
3
Technical Reports
7
Work Tips
2
Topic
Topic
Annual reports
27
Asphalt
29
Bicycles
32
Binders
28
Binders test methods
27
Bitumen
28
Bridge assessment
44
Bridge barriers
28
Bridge components
31
Bridge construction
52
Bridge design
72
Bridge maintenance
42
Bridge management
Bridge materials
41
Bridge performance
33
Capability assessment
27
Concrete
39
Cooperative ITS
27
Crash analysis
28
Data management
31
Driver licensing
27
Economic evaluation
29
Fibre reinforced polymer
26
Financing
27
Freight policy
27
Geotextiles
26
Granular materials
27
Heavy vehicle access
32
Heavy vehicle safety
28
Intelligent transport systems
29
Intersection design
27
Logistics
27
Materials testing
32
Motorcycles
27
Network management
26
Network performance
26
Pavement construction
27
Pavement design
31
Pavement management
32
Pavement performance
35
Pedestrians
31
Performance based standards
27
Prequalification
27
Process and documentation
28
Procurement
30
Project governance
28
Project planning
28
Rail bridges
35
Risk assessment
27
Roadside design
28
Rural and remote
28
Safe people
27
Safe roads
30
Safe System
28
Safety strategy
28
Seals
Smart motorways
Speed management
28
Steel
29
Strategic asset management
28
Structures management
30
Timber
28
Traffic operations
26
Waterway design
26
Year
Year
2024
29
2023
34
2022
57
2021
36
2020
29
2019
33
2018
30
2017
49
2016
30
2015
30
2014
2013
32
2012
30
2011
71
2010
30
2009
28
2008
31
2006
31
2005
30
2004
30
2002
29
2001
28
2000
29
1998
27
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 26 Publications
Bridge management
Remove Bridge management filter
Seals
Remove Seals filter
Smart motorways
Remove Smart motorways filter
2014
Remove 2014 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
What next for bridges?
ABC-IAR102-14
22 Oct 2014
Bridges
More
Bridge design is an ancient art. The principles for overcoming gravity, supporting people and vehicles and the best use of the materials at hand have evolved but are rooted in antiquity. In contrast with this stability we are perhaps going through…
1
2
3
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No