Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
14
Research Reports
1
Topic
Topic
Alcohol interlocks
16
Annual reports
17
Asphalt
21
Bicycles
24
Binders
19
Binders test methods
17
Bitumen
19
Bridge assessment
34
Bridge barriers
17
Bridge components
20
Bridge construction
42
Bridge design
63
Bridge maintenance
31
Bridge management
Bridge materials
32
Bridge performance
24
Capability assessment
16
Community attitudes
16
Concrete
30
Congestion
17
Cooperative ITS
16
Crash analysis
21
Data management
23
Design principles and process
16
Driver licensing
19
Drugs and alcohol
16
Economic evaluation
20
Equipment test methods
26
Fibre reinforced polymer
15
Financing
17
Freight policy
17
Geometric design
18
Geotextiles
16
Granular materials
16
Heavy vehicle access
29
Heavy vehicle safety
17
Heavy vehicle weighing
16
Indigenous communities
16
Intelligent transport systems
23
Intelligent transport systems 
15
Intersection design
16
Level of service
18
Logistics
16
Materials testing
32
Motorcycles
17
Network management
18
Network performance
15
Older drivers
17
Other assets management
16
Parking
17
Pavement construction
16
Pavement design
31
Pavement investigation test methods
31
Pavement management
29
Pavement performance
39
Pedestrians
21
Performance based standards
17
Prequalification
16
Process and documentation
17
Procurement
19
Project governance
17
Project planning
17
Rail bridges
24
Recycled material
16
Risk assessment
16
Road pricing
16
Roadside design
17
Rural and remote
19
Safe people
20
Safe roads
26
Safe System
21
Safety strategy
18
Seals
27
Smart motorways
18
Speed management
21
Steel
18
Strategic asset management
17
Structures management
19
Timber
17
Traffic management
18
Traffic operations
16
Waterway design
15
Year
Year
2024
17
2023
16
2022
38
2021
17
2018
16
2017
36
2016
2015
16
2014
2012
16
2011
59
2004
17
2002
17
1998
16
1995
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 15 Publications
Bridge management
Remove Bridge management filter
2016
Remove 2016 filter
2014
Remove 2014 filter
1995
Remove 1995 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
What next for bridges?
ABC-IAR102-14
22 Oct 2014
Bridges
More
Bridge design is an ancient art. The principles for overcoming gravity, supporting people and vehicles and the best use of the materials at hand have evolved but are rooted in antiquity. In contrast with this stability we are perhaps going through…
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No