Publications

Filter
Topic
Publication State
Showing 1 - 10 of 116 Publications
Water Retention of Concrete – Filtration
This test method is used to measure the ability of a concrete with a maximum coarse aggregate size of 20 mm or less to retain its water under pressure. This test determines the amount of water de-filtered when concrete is subjected to a certain…
Repair of Concrete Cracks
Austroads Technical Specification ATS 5341 sets out the requirements for the repair of cracks in concrete, including supply and quality of materials, surface preparation, application, relevant testing and acceptance criteria. The technical…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Chloride Content of Soil
Austroads test method 710 describes the procedure for determining the chloride content of select backfill material intended for use in reinforced earth structures. Chloride content is determined by water extraction and titrimetric analysis of the…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…
The Progression of Stable Unbonded-Fiber Reinforced Elastomeric Bearings
The progression to enhance the performance of elastomeric bearings has been an ongoing. The durability and seismic performance of elastomeric bearings are two areas where the implementation of fiber instead steel lamina may address these areas. A…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
New methods for match cast segmental construction in Australia on the Grafton Bridge
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…