Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Connected and Automated Vehicles
Corporate
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
19
Research Reports
3
Webinars
4
Topic
Topic
Active travel
28
Aggregates
29
Alcohol interlocks
27
Annual reports
27
Asphalt
39
Assessing Fitness to Drive
28
Automated vehicle policy
28
Automated vehicle safety
27
Bicycles
28
Binders
30
Binders test methods
33
Bitumen
34
Bituminous mixes test methods
34
Bridge assessment
55
Bridge barriers
26
Bridge components
37
Bridge construction
68
Bridge design
86
Bridge maintenance
57
Bridge management
48
Bridge materials
50
Bridge performance
Bridgeworks specifications
30
Capability assessment
28
Climate change
28
Concrete
32
Congestion
28
Contracts
28
Data management
Digital infrastructure
27
Drainage
29
Driver licensing
30
Drugs and alcohol
28
Earthworks
29
Economic evaluation
29
Electric vehicles
31
Freight modelling
27
Freight policy
28
Guide review
32
Heavy vehicle access
27
Heavy vehicle safety
27
Hydrogen vehicles
28
Incident management
28
Materials testing
35
Network management
29
Network operations
28
Older drivers
28
Pavement design
30
Pavement investigation test methods
27
Pavement maintenance
27
Pavement performance
31
Pavements specifications
29
Pedestrians
28
Prequalification
27
Procurement
28
Project governance
28
Project planning
31
Public transport
29
Recycled material
40
Roadside design
30
Rural and remote
27
Safe people
31
Safe roads
35
Safe System
28
Safe vehicles
28
Safety audit
29
Safety programs
27
Safety strategy
27
Seals
31
Smart motorways
28
Speed management
30
Stabilised materials
29
Strategic asset management
26
Structures management
27
Temporary traffic management
28
Traffic controls
31
Traffic management
29
Transport planning
27
Tunnel design
30
Tunnel operations
29
Tunnel safety
31
Year
Year
2024
27
2023
35
2022
2021
37
2020
28
2019
35
2018
35
2017
36
2016
31
2015
29
2014
40
2013
29
2012
31
2011
38
2010
32
2009
27
2008
28
2006
31
2004
28
2003
28
2002
27
2001
27
2000
28
1998
27
1997
27
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 26 Publications
Bridge performance
Remove Bridge performance filter
Data management
Remove Data management filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
High Workability Concrete - Verification of Properties and Performance Criteria
ABC2022-068-22
18 Nov 2022
Bridges
More
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
ABC2022-130-22
18 Nov 2022
Bridges
More
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
ABC2022-128-22
18 Nov 2022
Bridges
More
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
Managing the suspension bridge in Kangaroo Valley (Hampden Bridge)
ABC2022-087-22
18 Nov 2022
Bridges
More
The aim of this paper is to share the experience in managing the risks facing a 125 years old Hampden Bridge which is a unique road suspension bridge in Kangaroo Valley, New South Wales. It was built in 1897 and this is a load-deficient bridge which…
Sydney Gateway Viaduct Design Highlights
ABC2022-129-22
18 Nov 2022
Bridges
More
Sydney Gateway Stage 3 contains a 550m long Viaduct connecting the upgraded Qantas Drive with Sydney Airport domestic arrival and departure terminals. This paper will give an overview of some of the interesting and less conventional aspects of its…
Monash Freeway Upgrade - Warrigal Road Bridge Barrier Upgrade
ABC2022-093-22
18 Nov 2022
Bridges
More
The $761 million stage 2 of Monash Freeway Upgrade project involves the addition of 36 kilometres of new lanes to one of Melbourne's busiest freeways, as well as other upgrades at Beaconsfield interchange and O'Shea Road. As part of the project, the…
Replacing the piers of an existing continuous box girder bridge with portal structures
ABC2022-109-22
18 Nov 2022
Bridges
More
The Princes Highway outbound ramp is a 170 m long, five span bridge over the West Gate Freeway in Altona, Melbourne. As part of the West Gate Tunnel Project, at-grade realignment of the interchange configuration required replacement of two of the…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
ABC2022-116-22
17 Nov 2022
Bridges
More
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…
Case Study: Sustainability in Bridge Engineering - SH2 Wairoa River Bridge Cycleway Extension
ABC2022-114-22
17 Nov 2022
Bridges
More
State Highway 2 Wairoa River Bridge near Tauranga, constructed in 1966, is a 177m long post-tensioned concrete structure with mono pier columns supported on pile foundations. Adding a lightweight downstream cycleway extension in September 2020 has…
South Approach Structures on the Pattullo Bridge Replacement Project
ABC2022-117-22
17 Nov 2022
Bridges
More
The Pattullo Bridge Replacement Project (PBRP) involves building a new bridge to replace the existing Pattullo bridge over Fraser River in Vancouver, British Columbia (Canada). The new bridge will consist of a cable stayed Main Bridge over the river,…
1
2
3
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No