Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Corporate
Materials
Pavement
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
19
Specifications
1
Test Methods
4
Webinars
1
Topic
Topic
Active travel
27
Aggregates
28
Alcohol interlocks
26
Annual reports
26
Asphalt
33
Assessing Fitness to Drive
27
Automated vehicle policy
30
Automated vehicle safety
26
Bicycles
27
Binders
29
Binders test methods
32
Bitumen
33
Bituminous mixes test methods
29
Bridge assessment
54
Bridge barriers
25
Bridge components
36
Bridge construction
67
Bridge design
85
Bridge maintenance
56
Bridge management
47
Bridge materials
49
Bridge performance
Bridgeworks specifications
29
Capability assessment
27
Climate change
27
Concrete
31
Congestion
27
Contracts
27
Data management
31
Digital infrastructure
27
Drainage
28
Driver licensing
29
Drugs and alcohol
27
Earthworks
28
Economic evaluation
28
Electric vehicles
30
Freight modelling
26
Freight policy
27
Guide review
31
Heavy vehicle access
26
Heavy vehicle safety
26
Hydrogen vehicles
27
Incident management
27
Materials testing
34
Network management
28
Network operations
27
Older drivers
27
Pavement design
29
Pavement investigation test methods
26
Pavement maintenance
26
Pavement performance
30
Pavements specifications
27
Pedestrians
27
Prequalification
26
Procurement
27
Project governance
27
Project planning
30
Public transport
28
Recycled material
39
Roadside design
29
Rural and remote
26
Safe people
30
Safe roads
34
Safe System
27
Safe vehicles
27
Safety audit
28
Safety programs
26
Safety strategy
26
Seals
Smart motorways
27
Speed management
29
Stabilised materials
28
Strategic asset management
26
Structures management
26
Temporary traffic management
27
Traffic controls
30
Traffic management
28
Transport planning
26
Tunnel design
29
Tunnel operations
28
Tunnel safety
30
Year
Year
2024
26
2023
32
2022
2021
37
2020
28
2019
32
2018
29
2017
36
2016
30
2015
29
2014
43
2013
32
2012
32
2011
35
2010
29
2009
26
2008
30
2006
30
2005
29
2004
29
2003
27
2002
27
2001
28
2000
30
1998
26
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 25 Publications
Bridge performance
Remove Bridge performance filter
Seals
Remove Seals filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
High Workability Concrete - Verification of Properties and Performance Criteria
ABC2022-068-22
18 Nov 2022
Bridges
More
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
ABC2022-130-22
18 Nov 2022
Bridges
More
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
ABC2022-128-22
18 Nov 2022
Bridges
More
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
Managing the suspension bridge in Kangaroo Valley (Hampden Bridge)
ABC2022-087-22
18 Nov 2022
Bridges
More
The aim of this paper is to share the experience in managing the risks facing a 125 years old Hampden Bridge which is a unique road suspension bridge in Kangaroo Valley, New South Wales. It was built in 1897 and this is a load-deficient bridge which…
Sydney Gateway Viaduct Design Highlights
ABC2022-129-22
18 Nov 2022
Bridges
More
Sydney Gateway Stage 3 contains a 550m long Viaduct connecting the upgraded Qantas Drive with Sydney Airport domestic arrival and departure terminals. This paper will give an overview of some of the interesting and less conventional aspects of its…
Monash Freeway Upgrade - Warrigal Road Bridge Barrier Upgrade
ABC2022-093-22
18 Nov 2022
Bridges
More
The $761 million stage 2 of Monash Freeway Upgrade project involves the addition of 36 kilometres of new lanes to one of Melbourne's busiest freeways, as well as other upgrades at Beaconsfield interchange and O'Shea Road. As part of the project, the…
Replacing the piers of an existing continuous box girder bridge with portal structures
ABC2022-109-22
18 Nov 2022
Bridges
More
The Princes Highway outbound ramp is a 170 m long, five span bridge over the West Gate Freeway in Altona, Melbourne. As part of the West Gate Tunnel Project, at-grade realignment of the interchange configuration required replacement of two of the…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
ABC2022-116-22
17 Nov 2022
Bridges
More
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…
Case Study: Sustainability in Bridge Engineering - SH2 Wairoa River Bridge Cycleway Extension
ABC2022-114-22
17 Nov 2022
Bridges
More
State Highway 2 Wairoa River Bridge near Tauranga, constructed in 1966, is a 177m long post-tensioned concrete structure with mono pier columns supported on pile foundations. Adding a lightweight downstream cycleway extension in September 2020 has…
South Approach Structures on the Pattullo Bridge Replacement Project
ABC2022-117-22
17 Nov 2022
Bridges
More
The Pattullo Bridge Replacement Project (PBRP) involves building a new bridge to replace the existing Pattullo bridge over Fraser River in Vancouver, British Columbia (Canada). The new bridge will consist of a cable stayed Main Bridge over the river,…
1
2
3
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No