Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Active Travel
Asset Management
Bridges
Connected and Automated Vehicles
Corporate
Economics and Financing
Environment
Freight
Materials
Network
Pavement
Planning
Project Delivery
Road Design
Road Safety
Temporary Traffic Management
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
43
Corporate Reports
3
Guides
5
Research Reports
58
Specifications
13
Technical Reports
57
Test Methods
6
Webinars
13
Work Tips
28
Topic
Topic
Active travel
258
Aggregates
233
Annual reports
241
Asphalt
327
Automated vehicle policy
242
Automated vehicle safety
253
Bicycles
282
Binders
267
Binders test methods
250
Bitumen
281
Bituminous mixes test methods
252
Bridge assessment
316
Bridge components
284
Bridge construction
376
Bridge design
494
Bridge maintenance
331
Bridge management
340
Bridge materials
293
Bridge performance
286
Bridgeworks specifications
264
Capability assessment
239
Cemented materials
236
Climate change
237
Community attitudes
239
Concrete
Congestion
241
Contracts
236
Cooperative ITS
256
Crash analysis
278
Data management
299
Design principles and process
252
Digital infrastructure
236
Drainage
235
Driver licensing
265
Drugs and alcohol
240
Economic evaluation
Electric vehicles
240
Equipment test methods
252
Financing
239
Freight modelling
241
Freight policy
258
Geometric design
258
Granular materials
247
Guide review
264
Heavy vehicle access
299
Heavy vehicle safety
272
Heavy vehicle weighing
243
Incident management
244
Intelligent transport systems
254
Intersection design
255
Land use
237
Level of service
249
Materials testing
329
Motorcycles
237
Network management
271
Network operations
255
Network performance
245
Older drivers
238
Other assets management
246
Pavement construction
249
Pavement design
347
Pavement investigation test methods
248
Pavement maintenance
267
Pavement management
319
Pavement performance
411
Pavements specifications
249
Pedestrians
281
Performance based standards
242
Process and documentation
237
Procurement
238
Project governance
238
Project planning
244
Public transport
251
Rail bridges
257
Recycled material
253
Road pricing
236
Roadside design
248
Rural and remote
256
Safe people
289
Safe roads
338
Safe System
276
Safe vehicles
270
Safety audit
241
Safety strategy
253
Seals
Speed management
275
Steel
248
Strategic asset management
272
Structures management
257
Temporary traffic management
249
Traffic and safety
242
Traffic controls
266
Traffic management
281
Traffic modelling
247
Traffic operations
249
Traffic theories and studies
240
Transport planning
250
Tunnel design
247
Tunnel operations
242
Tunnel safety
248
Year
Year
2024
1
2023
11
2022
15
2021
11
2020
16
2019
9
2018
5
2017
25
2016
7
2015
6
2014
25
2013
7
2012
4
2011
19
2010
5
2009
4
2008
7
2006
6
2005
5
2004
6
2003
8
2002
4
2001
6
2000
7
1999
1
1998
2
1997
2
1994
2
Publication State
Publication State
Archived
18
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 226 Publications
Concrete
Remove Concrete filter
Economic evaluation
Remove Economic evaluation filter
Seals
Remove Seals filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Water Retention of Concrete – Filtration
ATM-780-23
Edition: 1.0
17 May 2023
Test Methods and Specifications
More
This test method is used to measure the ability of a concrete with a maximum coarse aggregate size of 20 mm or less to retain its water under pressure. This test determines the amount of water de-filtered when concrete is subjected to a certain…
Supply of Special Class Concrete
ATS-5315-23
Edition: 1.0
17 May 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 5315 sets out the requirements for the supply of Special Class Concrete used in: bridges with a design life of 100 years
Repair of Concrete Cracks
ATS-5341-23
Edition: 1.1
5 May 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 5341 sets out the requirements for the repair of cracks in concrete, including supply and quality of materials, surface preparation, application, relevant testing and acceptance criteria. The technical…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No