Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Active Travel
Asset Management
Bridges
Connected and Automated Vehicles
Corporate
Freight
Low and Zero Emission Vehicles
Materials
Network
Pavement
Project Delivery
Registration and Licensing
Road Design
Road Safety
Temporary Traffic Management
Test Methods and Specifications
Traffic Management
Tunnels
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
44
Corporate Reports
3
Guides
10
Research Reports
46
Specifications
13
Technical Reports
56
Test Methods
7
Webinars
28
Work Tips
28
Topic
Topic
Active travel
261
Aggregates
242
Annual reports
250
Asphalt
336
Automated vehicle policy
251
Automated vehicle safety
256
Bicycles
287
Binders
276
Binders test methods
257
Bitumen
290
Bituminous mixes test methods
261
Bridge assessment
325
Bridge components
291
Bridge construction
381
Bridge design
499
Bridge maintenance
339
Bridge management
349
Bridge materials
302
Bridge performance
293
Bridgeworks specifications
273
Capability assessment
245
Cemented materials
245
Climate change
248
Community attitudes
248
Concrete
Congestion
248
Contracts
245
Cooperative ITS
266
Crash analysis
291
Data management
306
Design principles and process
262
Digital infrastructure
245
Drainage
245
Driver licensing
273
Drugs and alcohol
249
Economic evaluation
289
Electric vehicles
247
Equipment test methods
261
Financing
253
Freight modelling
250
Freight policy
267
Geometric design
267
Granular materials
256
Guide review
271
Heavy vehicle access
304
Heavy vehicle safety
282
Heavy vehicle weighing
252
Incident management
248
Intelligent transport systems
262
Intersection design
262
Land use
246
Level of service
255
Materials testing
338
Motorcycles
246
Network management
275
Network operations
263
Network performance
253
Older drivers
247
Other assets management
254
Pavement construction
258
Pavement design
356
Pavement investigation test methods
257
Pavement maintenance
276
Pavement management
330
Pavement performance
420
Pavements specifications
258
Pedestrians
289
Performance based standards
251
Process and documentation
247
Procurement
247
Project governance
246
Project planning
256
Public transport
Rail bridges
266
Recycled material
262
Road pricing
245
Roadside design
257
Rural and remote
266
Safe people
297
Safe roads
338
Safe System
285
Safe vehicles
280
Safety audit
246
Safety strategy
258
Seals
Speed management
277
Steel
257
Strategic asset management
284
Structures management
264
Temporary traffic management
256
Traffic and safety
247
Traffic controls
Traffic management
276
Traffic modelling
254
Traffic operations
252
Traffic theories and studies
247
Transport planning
258
Tunnel design
256
Tunnel operations
249
Tunnel safety
255
Year
Year
2024
1
2023
13
2022
20
2021
19
2020
24
2019
9
2018
9
2017
28
2016
5
2015
6
2014
22
2013
7
2012
6
2011
16
2010
5
2009
3
2008
8
2007
2
2006
8
2005
4
2004
3
2002
6
2001
5
2000
4
1999
1
1998
1
Publication State
Publication State
Archived
13
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 235 Publications
Concrete
Remove Concrete filter
Public transport
Remove Public transport filter
Seals
Remove Seals filter
Traffic controls
Remove Traffic controls filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Water Retention of Concrete – Filtration
ATM-780-23
Edition: 1.0
17 May 2023
Test Methods and Specifications
More
This test method is used to measure the ability of a concrete with a maximum coarse aggregate size of 20 mm or less to retain its water under pressure. This test determines the amount of water de-filtered when concrete is subjected to a certain…
Supply of Special Class Concrete
ATS-5315-23
Edition: 1.0
17 May 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 5315 sets out the requirements for the supply of Special Class Concrete used in: bridges with a design life of 100 years
Repair of Concrete Cracks
ATS-5341-23
Edition: 1.1
5 May 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 5341 sets out the requirements for the repair of cracks in concrete, including supply and quality of materials, surface preparation, application, relevant testing and acceptance criteria. The technical…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No