Publications

Showing 1 - 5 of 5 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
C-ITS Interoperability with Existing ITS Infrastructure
This report defines how emerging C-ITS will integrate with existing ITS currently being operated by Austroads member road agencies. The report is limited to investigating what is required to achieve interoperability between 5.9 ITS (a term used to…
Model National Guidelines for Setting Speed Limits at High-risk Locations
This report incorporates recent research, best practice examples, and jurisdictional inputs to propose a set of model national speed limit guidelines for setting speed limits at high-risk locations. The model guidelines represent a harm reduction…
Methods for Reducing Speeds on Rural Roads: Compendium of Good Practice
This compendium presents information on speed as a contributor to rural road crashes. It provides information on treatments that can be used to address speed, either at key locations (curves, intersections or the approach to towns) or for routes in…